DOE CD-2/3b Follow-up Review
February 4, 2015 |
|
Cosmic Ray Veto |
|
Cosmic ray muons are a known source of potential background for experiments like Mu2e, and must be suppressed in order to achieve the
sensitivity required by the experiment. Backgrounds induced by cosmic rays can be defeated by passive shielding, e.g., overburden and thick concrete shielding, and by
an active veto detector whose purpose is to detect penetrating cosmic-ray muons.
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Technical Design Report |
4299 |
WBS Dictionary |
4300 |
Milestone Dictionary |
4301 |
Cosmic Ray Veto Requirements |
944 |
Cosmic Ray Veto Parameters |
862 |
Cosmic Ray Veto Interfaces |
1551 |
Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.
WBS Number |
Task Name |
Mu2e-doc # |
475.08.01 |
Project Management |
|
475.08.01.02 |
Preliminary & Final Design |
3902 |
475.08.01.03 |
Implementation & Closeout |
3903 |
  | | |
475.08.02 |
Mechanical Design |
|
475.08.02.01 |
Detector Design |
3904 |
475.08.02.02 |
Fabricate and Test Counter Prototypes |
3905 |
475.08.02.03 |
Cosmic Ray Veto Simulations |
3906 |
  | | |
475.08.03 |
Scintillator Extrusions |
|
475.08.03.01 |
Die Design and Procurement |
3907 |
475.08.03.02 |
Scintillator Extrusion Production |
3908 |
  | | |
475.08.04 |
Fibers |
|
475.08.04.01 |
Waveshifting Fiber Procurement |
3909 |
475.08.04.02 |
Waveshifting Fiber Quality Assurance Design and Fabrication |
3910 |
  | | |
475.08.05 |
Photodetectors |
|
475.08.05.01 |
Photodetector Procurement |
3911 |
475.08.05.02 |
Photodetector Quality Assurance Design and Fabrication |
3912 |
  | | |
475.08.06 |
Electronics |
|
475.08.06.01 |
Counter Mother Boards |
3913 |
475.08.06.02 |
Front End Boards |
3914 |
475.08.06.03 |
Readout Controllers |
3915 |
475.08.06.04 |
Integration with DAQ |
3928
|
  | | |
475.08.07 |
Module Fabrication |
|
475.08.07.01 |
Design and Fabrication Assembly Station |
3916 |
475.08.07.02 |
Assembly Station Quality Assurance Design and Fabrication |
3917 |
475.08.07.03 |
Fabrication of Module Parts |
3918 |
475.08.07.04 |
Module Production, Testing, and Shipping |
3919 |
475.08.07.05 |
Breakdown of Module Factory |
3920 |
  | | |
475.08.08 |
Detector Assembly and Installation |
|
475.08.08.01 |
Test Installation |
3921 |
475.08.08.02 |
Receive Production Modules at Fermilab |
3922 |
475.08.08.03 |
Cosmic Ray Test Stand |
3923 |
475.08.08.04 |
Module Support Structure |
3924 |
For assistance in obtaining any documentation, references, etc., please contact
mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager
(see Project Contact List).