DOE CD-2/3b Follow-up Review
February 4, 2015

Cosmic Ray Veto

Cosmic ray muons are a known source of potential background for experiments like Mu2e, and must be suppressed in order to achieve the sensitivity required by the experiment. Backgrounds induced by cosmic rays can be defeated by passive shielding, e.g., overburden and thick concrete shielding, and by an active veto detector whose purpose is to detect penetrating cosmic-ray muons.

Cosmic Ray Veto Design, Schedule and Planning Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Technical Design Report 4299 WBS Dictionary 4300
Milestone Dictionary 4301 Cosmic Ray Veto Requirements 944
Cosmic Ray Veto Parameters 862 Cosmic Ray Veto Interfaces 1551

Cosmic Ray Veto BOE Documents

Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.

WBS Number Task Name Mu2e-doc #
475.08.01 Project Management
475.08.01.02   Preliminary & Final Design 3902
475.08.01.03   Implementation & Closeout 3903
 
475.08.02 Mechanical Design
475.08.02.01   Detector Design 3904
475.08.02.02   Fabricate and Test Counter Prototypes 3905
475.08.02.03   Cosmic Ray Veto Simulations 3906
 
475.08.03 Scintillator Extrusions
475.08.03.01   Die Design and Procurement 3907
475.08.03.02   Scintillator Extrusion Production 3908
 
475.08.04 Fibers
475.08.04.01   Waveshifting Fiber Procurement 3909
475.08.04.02   Waveshifting Fiber Quality Assurance Design and Fabrication 3910
 
475.08.05 Photodetectors
475.08.05.01   Photodetector Procurement 3911
475.08.05.02   Photodetector Quality Assurance Design and Fabrication 3912
 
475.08.06 Electronics
475.08.06.01   Counter Mother Boards 3913
475.08.06.02   Front End Boards 3914
475.08.06.03   Readout Controllers 3915
475.08.06.04   Integration with DAQ 3928
 
475.08.07 Module Fabrication
475.08.07.01   Design and Fabrication Assembly Station 3916
475.08.07.02   Assembly Station Quality Assurance Design and Fabrication 3917
475.08.07.03   Fabrication of Module Parts 3918
475.08.07.04   Module Production, Testing, and Shipping 3919
475.08.07.05   Breakdown of Module Factory 3920
 
475.08.08 Detector Assembly and Installation
475.08.08.01   Test Installation 3921
475.08.08.02   Receive Production Modules at Fermilab 3922
475.08.08.03   Cosmic Ray Test Stand 3923
475.08.08.04   Module Support Structure 3924

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (see Project Contact List).