DOE CD-2/3b Follow-up Review
February 4, 2015

Tracker

The Mu2e tracker provides the primary momentum measurement for conversion electrons. The tracker must identify and measure 105 MeV/c electrons while rejecting backgrounds, and it must provide this functionality while situated in the warm, evacuated bore of a superconducting solenoid that provides a uniform magnetic field of about 1 Tesla.

Tracker Design, Schedule and Planning Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Technical Design Report
4299 WBS Dictionary 4300
Milestone Dictionary 4301 Tracker Requirements 732
Tracker Front End Electronics Requirements 3879 Tracker Interfaces 1562

Tracker BOE Documents

Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.

WBS Number Task Name Mu2e doc #
475.06.01 Project Management
475.06.01.02   Preliminary & Final Design 3901
475.06.01.03   Implementation & Close-out 3900
 
475.06.02 Straws
475.06.02.01   Straw Tubes 3899
475.06.02.03   Wire Stringing 3898
 
475.06.03 Straw Assemblies
475.06.03.01   Single-panel 3897
475.06.03.02   Single Plane 3896
475.06.03.03   Gas Manifold 3895
475.06.03.04   Full Tracker Support and Assembly 3894
 
475.06.04 Front End Electronics
475.06.04.01   Preamp 3893
475.06.04.02   Digitizer 3892
475.06.04.03   Readout Controller 3891
475.06.04.04   Test Stands 3890
 
475.06.05 Infrastructure
475.06.05.01   Gas System 3889
475.06.05.02   High Voltage System 3888
475.06.05.03   Low Voltage System 3887
475.06.05.04   Cooling 3886
475.06.05.05   Cabling and Control 3885
 
475.06.06 Detector Assembly & Installation
475.06.06.01   Detector Assembly & Installation 3884

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (see Project Contact List).