DOE CD-2/3b Follow-up Review
February 4, 2015 |
|
Tracker |
|
The Mu2e tracker provides the primary momentum measurement for conversion
electrons. The tracker must identify and measure 105 MeV/c
electrons while rejecting backgrounds, and it must provide this functionality while situated in the warm, evacuated bore of a superconducting solenoid that
provides a uniform magnetic field of about 1 Tesla.
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Technical Design Report |
4299 |
WBS Dictionary |
4300 |
Milestone Dictionary |
4301 |
Tracker Requirements |
732 |
Tracker Front End Electronics Requirements |
3879 |
Tracker Interfaces |
1562 |
Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.
WBS Number |
Task Name |
Mu2e doc # |
475.06.01 |
Project Management |
|
475.06.01.02 |
Preliminary & Final Design |
3901
|
475.06.01.03 |
Implementation & Close-out |
3900
|
  | | |
475.06.02 |
Straws |
|
475.06.02.01 |
Straw Tubes |
3899
|
475.06.02.03 |
Wire Stringing |
3898
|
  | | |
475.06.03 |
Straw Assemblies |
|
475.06.03.01 |
Single-panel |
3897
|
475.06.03.02 |
Single Plane |
3896 |
475.06.03.03 |
Gas Manifold |
3895
|
475.06.03.04 |
Full Tracker Support and Assembly |
3894
|
  | | |
475.06.04 |
Front End Electronics |
|
475.06.04.01 |
Preamp |
3893
|
475.06.04.02 |
Digitizer |
3892
|
475.06.04.03 |
Readout Controller |
3891
|
475.06.04.04 |
Test Stands |
3890
|
  | | |
475.06.05 |
Infrastructure |
|
475.06.05.01 |
Gas System |
3889
|
475.06.05.02 |
High Voltage System |
3888
|
475.06.05.03 |
Low Voltage System |
3887
|
475.06.05.04 |
Cooling |
3886
|
475.06.05.05 |
Cabling and Control |
3885
|
  | | |
475.06.06 |
Detector Assembly & Installation |
|
475.06.06.01 |
Detector Assembly & Installation |
3884
|
For assistance in obtaining any documentation, references, etc., please contact
mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager
(see Project Contact List).
Top of page