Mu2e DOE CD-2/3b Follow-up Review

DOE CD-2/3b Follow-up Review
February 4, 2015

Accelerator

The muon beam on the Mu2e stopping target is derived from the decay of pions produced by the interaction of an intense 8-GeV kinetic energy proton beam with a tungsten target. Mu2e will use two proton batches from the Booster synchrotron in a given Main Injector NOvA cycle.

Accelerator Design, Schedule and Planning Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Technical Design Report
4299 WBS Dictionary 4300
Milestone Dictionary 4301 Accelerator Infterface Document 1529

Requirements Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Science Driven Requirements 4381 Production Target Requirements 887
Proton Beam Requirements 1105 Production Solenoid Heat and Radiation Shield Requirements 1092
Beam Extinction Requirements 1175 Proton Beam Absorber Requirements 948
Extinction Monitor Requirements 894 Protection Collimator Requirements 2897

Accelerator Reviews, Approvals, and Miscellaneous Reports

Title Mu2e-doc-# Title Mu2e-doc-#
Passive Shielding Waiver
3823 TLM Preliminary Approval 4132
Preliminary Shielding Assessments Approval 4313 External Beamline Cost & Schedule Review 4529
STFC RAL Contract II Final Report 4305 STFC RAL Contract I Final Report 2406

Accelerator BOE Documents

Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.

WBS Number Task Name Mu2e
doc #
475.02.01 Project Management 1888
 
475.02.03 Instrumentation & Controls
475.02.03.01     Mu2e Accelerator Controls
475.02.03.01.1          Transport Controls & Delivery Ring Controls 3703
475.02.03.01.2          Mu2e Experimental Hall Controls 3553
475.02.03.02     Delivery Ring Instrumentation
475.02.03.02.1          Delivery Ring DC Beam Meausurement 3690
475.02.03.02.2          Delivery Ring Tune Measurement 3689
475.02.03.03     Extraction Beamline Instrumentation
475.02.03.03.1          M4 Line Profile and Intensity Monitors 3675
475.02.03.03.2          M4 Line Beam Loss Monitors 4480
475.02.03.04     Accelerator Controls and Instrumentation Project Management 3843
 
475.02.04 Radiation Safety Improvements
475.02.04.01     AP1 Line to Delivery Ring Total Loss Monitoring System 1890
475.02.04.02     Delivery Ring Raditation Safety Upgrades
475.02.04.02.1          In Tunnel Shielding Over Loss Points 1872
475.02.04.02.2          Ring Safety System Total Loss Monitoring 1891
475.02.04.03     External Beam Line Safety System
475.02.04.03.1          External Beam Line Safety System Interlocks 3723
475.02.04.03.2          External Beam Line Total Loss Monitoring 2120
475.02.04.03.3          External Beamline in Tunnel Shielding 4292
475.02.04.04     Mu2e Safety Systems
475.02.04.04.1          Target Hall Safety Systems 3724
475.02.04.04.2          Extinction Enclosure Safety Systems 3725
475.02.04.04.3          Detector Hall Safety Systems 3726
475.02.04.04.4          Oxygen Hazard Deficiency (ODH) Safety System 3727
475.02.04.04.5          Safety System Trunk Line Cables 3728
475.02.04.04.6          Radiation Air Monitor 3729
475.02.04.04.7          Frisker Stations 3730
475.02.04.05     Tech. Documentation for Rad. Safety Improvements 4287
 
475.02.05 Resonant Extraction System
475.02.05.01     General Design of Resonant Extraction System 3700
475.02.05.02     Electrostatic Septum (Mechanical) for Resonant Extraction 3780
475.02.05.03     Magnets for the Resonant Extraction System
475.02.05.03.1          Quadrupole Magnets for Resonant Extraction 3511
475.02.05.03.2          Sextupole Magnets for Resonant Extraction 3515
475.02.05.03.3          Dynamic Bump Magnets for Resonant Extraction 3510
475.02.05.03.4          Skew-Quadrupole Magnets for Resonant Extraction 4291
475.02.05.04     Fast Feedback Devices (Spill Monitor) for Resonant Extraction 3693
475.02.05.05     Fast Feedback Electronics for Resonant Extraction 3694
475.02.05.06     RF Knockout Kicker for Resonant Extraction 3695
475.02.05.07     Magnet Power Supplies for Resonant Extraction
475.02.05.07.1          Quadrupole Power Supplies for Resonant Extraction 3509
475.02.05.07.2          Harmonic Sextupole Power Supplies for Resonant Extraction 3520
475.02.05.07.3          Dynamic Bump Power Supplies for Resonant Extraction 3460
475.02.05.07.4          Skew-Quadropole Magnet PS for Resonant Extraction 4296
475.02.05.08     Tech Documentation for Resonant Extraction 3696
 
475.02.06 Delivery Ring RF System
475.02.06.01     Low Level RF System 1674
475.02.06.02     Delivery Ring RF Studies & Tuning 1678
475.02.06.05     Tech. Documentation for Delivery Ring RF System 3639
 
475.02.07 External Beamline
475.02.07.01     External Beamline Magnets 3706
475.02.07.02     External Beamline - Magnet Power Supplies 3771
475.02.07.03     External Beamline Mechanical & Vacuum Systems 2164
475.02.07.04     External Beamline Diagnostic Absorber 1655
475.02.07.05     External Beamline Optics 3798
475.02.07.06     Tech. Documentation and PM for External Beamline 4298
475.02.07.07     Implementation 4483
 
475.02.08 Extinction Systems
475.02.08.02     External Extinction System
475.02.08.02.1          External Extinction System AC Dipole Magnets 4276
475.02.08.02.2          External Extinction System AC Dipole Power Supplies 4278
475.02.08.02.3          External Extinction System Collimation 4277
475.02.08.03     Extinction Monitoring
475.02.08.03.2          External Extinction Monitoring 4268
475.02.08.03.3          Removable Radiation Sheilding 4288
475.02.08.04     Tech. Documentation for Extinction Systems 4289
 
475.02.09 Target Station
475.02.09.01     Simulations and Calculations 4244
475.02.09.02     Fabricate Target 4303
475.02.09.03     Target Handling 3720
475.02.09.04     Production Solenoid Heat & Radiation Shield 4267
475.02.09.05     Target Station Proton Beam Absorber 1665
475.02.09.06     Solenoid & HRS Protection Collimator 1663
475.02.09.08     Tech. Documentation for the Target Station 4245