DOE Independent Project Review of Mu2e |
Solenoids |
The solenoids perform several critical functions for the Mu2e experiment. Magnetic fields generated from these magnets are used to efficiently collect and transport muons from the production target to the muon stopping target while minimizing the transmission of other particles. |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Technical Design Report | 4299 |    |    |
Milestone Dictionary | 4301 | WBS Dictionary | 4300 |
Monthly EVMS Performance Report - July | 28056 | Monthly EVMS Performance Report - August | 28495 |
Monthly EVMS Performance Report - September | 29100 | Monthly EVMS Performance Report - October | 29919 |
Monthly Performance Graphics | 4659 |    | |
Gantt Chart | 29919 | Critical Path | 30307 |
Baseline Schedule | 30307 | Forecast | 29919 |
Monthly RLS Turn-around Status Collection Sheet | 2999 | Dollarized RAM | 4312 |
Solenoids Work Authorization Documents | List | Solenoids Variance Reports | List |
Corrective Actions Log | 4930 | Change Control Procedure | 2971 |
Change Request Log | 4600 | Change Control Topic | List |
Change Control by CAM & CA | Instructions | Mu2e Risk Register | 4320 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Science Driven Requirements | 4381 |    |    |
Quench Protection System Requirements | 1238 | Detector Solenoid Requirements | 946 |
Transport Solenoid Collimators Requirements | 1129 | Transport Solenoid Requirements | 947 |
Production Solenoid Heat and Radiation Shield Requirements | 1092 | Production Solenoid Requirements | 945 |
Power Supply System Requirements | 1237 | Magnetic Field Measurement Requirements | 1275 |
Mu2e Cryogenic Distribution Requirements | 1244 | Solenoid Interface Control Document | 1470 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
  Concerning the Conductors: |
|||
Advanced Acquisition Plan for Solenoid Conductors | 2493 | Conductor Specification Packages | 2488 |
R&D Conductor Performance and Production Readiness | 4221 |    |    |
  Concerning the Production Solenoid: |
|||
Advanced Acquisition Plan for the PS | 3019 | PS Reference Design | 3647 |
PS Drawings and Solid Model | 3732 | PS Procurement Specifications | 3669 |
  Concerning the Detector Solenoid: |
|||
Advanced Acquisition Plan for the DS | 3021 | DS Reference Design | 3664 |
DS Drawings and Solid Model | 3733 | DS Procurement Specifications | 3670 |
DS Tolerance studies | 2870 |    |    |
  Concerning the Transport Solenoid: | |||
Advanced Acquisition Plan for the TS | 4309 | TS Preliminary Design | 4214 |
Advanced Acquisition Plan for the TS Cryostat | 11588 | Advanced Acquisition Plan for the TS Magnet Supports | 11591 |
TS Tolerance Studies | 2156 | Effect of coil displacements on the magnetic center | 2403 |
TS Module Procurement Specification | 5083 | TS Module Acceptance Test Plan | 5148 |
  Concerning the Cryogenic Distribution System: | |||
Feedbox Design Requirements | 5139 | Advanced Acquisition Plan for the Feedboxes | 7183 |
Cryogenic Distribution P&ID | 4520 | Cryo Distribution System Review | Website |
  Concerning the Quench Protection & Monitoring System: | |||
Quench Protection Technical Requirements Specs | 6578 | Quench Protection Interface to Power Supplies | 6605 |
Quench Protection Commissioning Requirements | 6599 | Slow Monitoring Design Requirements | 7125 |
  Concerning the Field Mapping System: | |||
DS/PS Mechanical Design | 6690, 6691 | Hall Probe Fixtures/Calib Equip | 6693, 6694 |
Survey and alignment | 6696 | QA Plan | 7205 |
  Concerning the Power Supplies: | |||
Technical Documentation | 6394 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Replies to Recommendations from Construction Readiness Reviews | 11663 | Replies to Recommendations from Design Reviews | 6258 |
TS Coil Modules CRR Report | 6102 | Quench Protection System CRR Report | 19099 |
TS Cryostat I CRR Report | 8653 | Replies to Recommendations from TS Cryostat I CRR | 9474 |
Cryogenic Feedbox & Transfer Line CRR Report | 8827 | Replies to Recommendations from Cryo Feedbox/Transfer Lines CRR | 9477 |
Slow Monitoring CRR Report | 16304 | Replies to Recommendations from Slow Monitoring CRR | 16502 |
TS Cryostat II CRR Report | 16490 | Replies to Recommendations from TS Cryostat II CRR | 16499 |
Schedule of Completed Construction Readiness Reviews | List |    |    |
Solenoid Construction Readiness Review Website | Website | Solenoid Oversight Committee | Website |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Mu2e Subsystem Quality Planning Document | 6005 | Quality Assurance-Transfer Lines | 8687 |
Quality Assurance-TS Inner Cryostat | 9067 | Quality Assurance-TS Mag Assembly Equip | 9049 |
Quality Assurance-Cryo Controls&Instrumentation | 8353 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
GA DS8 Incident Summary | GA Memo | DS8:FRA Signed-QN | FRA |
Additional GA QN Reports | GA QNs | ASG Non-Conformance Reports | ASG NCRs |
For assistance in obtaining any documentation, references, etc., please contact mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager (see Project Contact List).