DOE Independent Project Review of Mu2e
Dec 10-12, 2019

Solenoids

The solenoids perform several critical functions for the Mu2e experiment. Magnetic fields generated from these magnets are used to efficiently collect and transport muons from the production target to the muon stopping target while minimizing the transmission of other particles.

Solenoids Schedule and Planning Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Technical Design Report
4299      
Milestone Dictionary 4301 WBS Dictionary 4300
Monthly EVMS Performance Report - July 28056 Monthly EVMS Performance Report - August 28495
Monthly EVMS Performance Report - September 29100 Monthly EVMS Performance Report - October 29919
Monthly Performance Graphics 4659   
Gantt Chart 29919 Critical Path 30307
Baseline Schedule 30307 Forecast 29919
Monthly RLS Turn-around Status Collection Sheet 2999 Dollarized RAM 4312
Solenoids Work Authorization Documents List Solenoids Variance Reports List
Corrective Actions Log 4930 Change Control Procedure 2971
Change Request Log 4600 Change Control Topic List
Change Control by CAM & CA Instructions Mu2e Risk Register 4320

Solenoids Requirements & Interface Control Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Science Driven Requirements 4381      
Quench Protection System Requirements 1238 Detector Solenoid Requirements 946
Transport Solenoid Collimators Requirements 1129 Transport Solenoid Requirements 947
Production Solenoid Heat and Radiation Shield Requirements 1092 Production Solenoid Requirements 945
Power Supply System Requirements 1237 Magnetic Field Measurement Requirements 1275
Mu2e Cryogenic Distribution Requirements 1244 Solenoid Interface Control Document 1470

Solenoids Design and Specifications Documents

Title Mu2e-doc-# Title Mu2e-doc-#
 
Concerning the Conductors:
Advanced Acquisition Plan for Solenoid Conductors 2493 Conductor Specification Packages 2488
R&D Conductor Performance and Production Readiness 4221      
 
Concerning the Production Solenoid:
Advanced Acquisition Plan for the PS 3019 PS Reference Design 3647
PS Drawings and Solid Model 3732 PS Procurement Specifications 3669
 
Concerning the Detector Solenoid:
Advanced Acquisition Plan for the DS 3021 DS Reference Design 3664
DS Drawings and Solid Model 3733 DS Procurement Specifications 3670
DS Tolerance studies 2870      
 
Concerning the Transport Solenoid:
Advanced Acquisition Plan for the TS 4309 TS Preliminary Design 4214
Advanced Acquisition Plan for the TS Cryostat 11588 Advanced Acquisition Plan for the TS Magnet Supports 11591
TS Tolerance Studies 2156 Effect of coil displacements on the magnetic center 2403
TS Module Procurement Specification 5083 TS Module Acceptance Test Plan 5148
 
Concerning the Cryogenic Distribution System:
Feedbox Design Requirements 5139 Advanced Acquisition Plan for the Feedboxes 7183
Cryogenic Distribution P&ID 4520 Cryo Distribution System Review Website
 
Concerning the Quench Protection & Monitoring System:
Quench Protection Technical Requirements Specs 6578 Quench Protection Interface to Power Supplies 6605
Quench Protection Commissioning Requirements 6599 Slow Monitoring Design Requirements 7125
 
Concerning the Field Mapping System:
DS/PS Mechanical Design 6690, 6691 Hall Probe Fixtures/Calib Equip 6693, 6694
Survey and alignment 6696 QA Plan 7205
 
Concerning the Power Supplies:
Technical Documentation 6394      

Solenoids Construction Readiness Reviews & Oversight Committee

Title Mu2e-doc-# Title Mu2e-doc-#
Replies to Recommendations from Construction Readiness Reviews 11663 Replies to Recommendations from Design Reviews 6258
TS Coil Modules CRR Report 6102 Quench Protection System CRR Report 19099
TS Cryostat I CRR Report 8653 Replies to Recommendations from TS Cryostat I CRR 9474
Cryogenic Feedbox & Transfer Line CRR Report 8827 Replies to Recommendations from Cryo Feedbox/Transfer Lines CRR 9477
Slow Monitoring CRR Report 16304 Replies to Recommendations from Slow Monitoring CRR 16502
TS Cryostat II CRR Report 16490 Replies to Recommendations from TS Cryostat II CRR 16499
Schedule of Completed Construction Readiness Reviews List      
Solenoid Construction Readiness Review Website Website Solenoid Oversight Committee Website

Solenoids Safety & Quality Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e Subsystem Quality Planning Document
6005 Quality Assurance-Transfer Lines
8687
Quality Assurance-TS Inner Cryostat
9067 Quality Assurance-TS Mag Assembly Equip
9049
Quality Assurance-Cryo Controls&Instrumentation
8353   
  

Solenoid Vendors' Non-Conformance Documents

Title Mu2e-doc-# Title Mu2e-doc-#
GA DS8 Incident Summary GA Memo DS8:FRA Signed-QN FRA
Additional GA QN Reports GA QNs ASG Non-Conformance Reports ASG NCRs

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (see Project Contact List).

Top of page

Last modified: 12/09/2019 |