Solenoids Construction Readiness Reviews

Documentation Home Page

The Mu2e project received CD-3c approval from the DOE on July 14, 2016, allowing the project to start construction of the Tracker subsystem components. Before initiating fabrication, a Construction Readiness Review is required to confirm the soundness and completeness of the design, the procurement and quality assurance plans as well as the coherence of all interfaces with respect to neighboring sub-detectors. Peer reviews of the key elemenents of the project in advance of approval to construct is part of this process.

The solenoids perform several critical functions for the Mu2e experiment. Magnetic fields generated from these magnets are used to efficiently collect and transport muons from the production target to the muon stopping target while minimizing the transmission of other particles.

This web page collects information useful to the Construction Readiness Review committees.


For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (cf. Project Contact List).



Note: documents linked from this page are password protected.

CD-3a: PS/DS/TS Superconductor CRR

CD-3a: Superconductor CRR Agenda for 10 June, 2014 8:00-16:00 (Chicago Time)
Meeting Location - DOE Germantown Headquarters

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e DocDB Agenda Superconductor CD-3a Charge 4204 TS Coil Module CRR Membership Here
Mu2e DocDB Agenda SC CD-3a/CRR Website Website Superconductor CD-3a/CRR Website
SC CD-3a/CRR Final Report 4317 SC CD-3a/CRR Response to Recommendations 4316

TS Coil Module CRR

TS Coil Module CRR Agenda for 2 September, 2015 8:00-16:00 (Chicago Time)
Meeting Location - Hermitage (ICB 2E)

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e DocDB Agenda TS Coil Module Charge 5929 TS Coil Module CRR Membership Here
Mu2e DocDB Agenda TS Coil Module CRR Website Website TS Coil Module CRR Website
TS Coil Module CRR Final Report 6102      

TS Cryostat CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
TS Cryostat CRR1 Charge 8512 TS Cryostat CRR1 Membership Here
Mu2e DocDB Agenda TS Cryostat CRR1 Website Website

TS Cryostat CRR1 Agenda for 27 January, 2017 8:00-12:30 (Chicago Time)
Meeting Location - Hermitage (ICB 2E)

Time Title Speaker Mu2e-doc-#   
08:00 TS Overview (V. Lombardo) 8542   
8:30 Mu2e TS Warm Bore & Inner Thermal Shield Documentation (T. Nicol) 8426   
9:30 Break         
9:45 TS Assembly Tooling (J. Brandt) 8515  
10:15 Discussion/Executive Session        
12:00 Lunch         
13:30 Closeout        

Additional Documentation for TS Cryostat CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
Transport Solenoid Requirements 947 Mu2e TS Preliminary Design Report 4214
List of TS inner Cryostat Eng Drawings/Docs in Teamcenter
8515      

Closeout Documentation for TS Cryostat CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
TS Cryostat CRR1 Final Report 8653 Responses to Recommenations from TS Cryostat CRR1
9474

Cryogenic Distribution CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Cryo Distribution CRR Charge 8652 Cryo Distribution CRR Membership Here
Mu2e DocDB Agenda Cryo Distribution CRR Website Website

Cryo Distribution System CRR Agenda for 16 February, 2017 9:00-15:30 (Chicago Time)
Meeting Location - Hermitage (ICB 2E)

Time Title Speaker Mu2e-doc-#      
09:00 Cryo Feedbox & Transfer Line Intro (R. Schmitt) 8574      
9:30 Feedbox (T. Tope) 8575      
10:30 Break            
10:45 Transfer Line (J. Kilmer) 8576      
11:30 Discussion            
12:00 Lunch            
13:00 Executive Session            
15:30 Closeout    8740      

Additional Documentation for Cryo Distribution CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e Cryogenic Distribution Requirements 1244 Mu2e Cryo Distribution Design Review Report 7029
TS Feed Box Peer Review
8683 Feed Box Tech Specs for RFP
8688
Feedbox Design/Analysis Docs
8695 Transfer Line/Design/Analysis Docs
8693
Cryo Distribution System P&ID (incl. MC-1 and A0)
4520 QA plan for Inside Transfer Lines
8687
Mu2e Solenoid Interface Control Document
1470      

Closeout Documentation for TS Cryostat CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
Cryo Distribution CRR Final Report 8827 Responses to Recommenations from the Cryo Distribution CRR
9477

Slow Monitoring Distribution CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Slow Monitoring CRR Charge 15552 Slow Monitoring CRR Membership Here
Mu2e DocDB Agenda Slow Monitoring CRR Website Website

Slow Monitoring CRR Agenda for 15 February, 2018 9:00-13:30 (Chicago Time)
Meeting Location - APEX (IARC OTE 2nd Floor East)

Time Title Speaker Mu2e-doc-#   
08:00 Solenoids QPM Slow Monitoring (D. Orris) 15549   
9:00 Slow Monitoring (I. Young) 15630   
10:30 Break         
10:00 Discussion/Exec Session/Lunch        
13:00 Closeout   15693  

Additional Documentation for Slow Monitoring CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e Slow Monitoring Design Requirements 7125 Mu2e Slow Monitoring Design Review Report 6620
Slow Monitoring Network Architecture
15471 DS-PS Wensor Wires and Connector Specs
8076
Slow Monitoring Wiring Diagram
15627 Slow Monitoring BOM
15468
QPS Clean Power Distribution & Grounding
15540 QPS Rack Layout
15537

Closeout Documentation for Slow Monitoring CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Slow Monitoring CRR Final Report 16304 Responses to Recommenations from the Slow Monitoring CRR
16502

TS Cryostat CRR2

Title Mu2e-doc-# Title Mu2e-doc-#
TS Cryostat CRR2 Charge 15174 TS Cryostat CRR2 Membership Here
Mu2e DocDB Agenda TS Cryostat CRR2 Website Website

TS Cryostat CRR2 Agenda for 23 February, 2018 9:00-15:30 (Chicago Time)
Meeting Location - Curia II

Time Title Speaker Mu2e-doc-#   
08:00 TS Overview for TS Cryostat CRR2 (A. Hocker) 15809   
8:30 TS Cryostat (T. Nicol) 15801   
9:30 Break         
9:45 TS Interfaces (J. Brandt) 15261   
10:45 TS Assembly Outer Cryostat/td> (P. Schlabach) 15768   
11:45 Lunch         
13:00 Exec Session         
15:00 Closeout   15842   

Additional Documentation for TS Cryostat CRR2

Title Mu2e-doc-# Title Mu2e-doc-#
TS Requirements
947 TS Preliminary Design Report
4214
TS Cryostat Final Design Review Report 14026 TS Vacuum Vessel, Cold Mass Support & Thermal Shield Design Report 13196
Solenoid Interface Control Document
1470 TS Coil Module Support Procurement Plan
15258
TS Vacuum Vessel & Outer Thermal Shield QA/QC
14319 TS Vacuum Vessel & Outer Thermal Shield Procurement Plan
14367

Closeout Documentation for TS Cryostat CRR2

Title Mu2e-doc-# Title Mu2e-doc-#
TS Cryostat CRR2 Final Report 16490 Responses to Recommenations from the TS Cryostat CRR2
16499

Solenoids Requirements & Interface Control Documents

Title Mu2e-doc-# Title Mu2e-doc-#      
Technical Design Report
4299 Science Driven Requirements 4381      
Quench Protection System Requirements 1238 Detector Solenoid Requirements 946      
Transport Solenoid Collimators Requirements 1129 Transport Solenoid Requirements 947      
Production Solenoid Heat and Radiation Shield Requirements 1092 Production Solenoid Requirements 945      
Power Supply System Requirements 1237 Magnetic Field Measurement Requirements 1275      
Mu2e Cryogenic Distribution Requirements 1244 Solenoid Interface Control Document 1470      

Solenoids Design and Specifications Documents

Title Mu2e-doc-# Title Mu2e-doc-#
 
Concerning the Conductors:
Advanced Acquisition Plan for Solenoid Conductors 2493 Conductor Specification Packages 2488
R&D Conductor Performance and Production Readiness 4221      
 
Concerning the Production Solenoid:
Advanced Acquisition Plan for the PS 3019 PS Reference Design 3647
PS Drawings and Solid Model 3732 PS Procurement Specifications 3669
 
Concerning the Detector Solenoid:
Advanced Acquisition Plan for the DS 3021 DS Reference Design 3664
DS Drawings and Solid Model 3733 DS Procurement Specifications 3670
DS Tolerance studies 2870      
 
Concerning the Transport Solenoid:
Advanced Acquisition Plan for the TS 4309 TS Preliminary Design 4214
TS Tolerance Studies 2156 Effect of coil displacements on the magnetic center 2403
TS Module Procurement Specification 5083 TS Module Acceptance Test Plan 5148
 
Concerning the Cryogenic Distribution System:
Feedbox Design Requirements 5139 Cryogenic Distribution P&ID 4520
Cryo Distribution System Review Website      
 
Concerning the Quench Protection & Monitoring System:
Quench Protection Technical Requirements Specs 6578 Quench Protection Interface to Power Supplies 6605
Quench Protection Commissioning Requirements 6599 Slow Monitoring Design Requirements 7125
 
Concerning the Field Mapping System:
DS/PS Mechanical Design 6690, 6691 Hall Probe Fixtures/Calib Equip 6693, 6694
Survey and alignment 6696 QA Plan 7205
 
Concerning the Power Supplies:
Technical Documentation 6394      

Solenoids Design Reviews & Oversight Committee

Title Mu2e-doc-# Title Mu2e-doc-#
Replies to Recommendations from Design Reviews 6258      
PS/DS Design Review Report 7198 Production Solenoid & Detector Solenoid 50% Design Review Report 7079
Transport Solenoid Cryostat Design Review Report 7105 Transport Solenoid Modules Design Review Report 5039
Transport Solenoid Construction Readiness Review Report 6102 Solenoid Quench Detection System Design Review Report 6705
Cryo Distribution System Design Review Report 7029 Field Mapping System Design Review Report 6967
Solenoid Power System Design Review Report 6476 Solenoid Slow Monitoring & Cryo Controls Design Review Report 6620
Solenoid Acquisition Oversight Committee Website      

Solenoids Safety & Quality Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e Subsystem Quality Planning Document
6005      

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (see Project Contact List).