CD-3a Review of Mu2e
June 10, 2014

Review Documentation Home Page

The Mu2e Project participated in a DOE CD-1 Review in June 2012 and was awarded CD-1 approval in July 2012. This is a CD-3a review to authorize purchase of production lengths of the superdconducting cables needed to fabricate the Mu2e Production and Transport solenoids. The cable is a long lead item.

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (cf. Project Contact List).


Jump to: Bottom of page    Documents for This Review    Documents from Past Reviews

Agenda and Presentations (eastern time)
   Location in Germantown: Conference Room Z-231
   Location at Fermilab: IB3 Mezzanine Conference Room
   Call-in number: (202) 287-6245

Time Title Speaker Mu2e-doc-#
09:00 Executive Session (Committee)
09:15 Project Status and CD-3a Readiness (R. Ray) 4227
09:55 Discussion (All)
10:10 Coffee Break
10:30 Conductor Design and Requirements (M. Lamm) 4220
11:10 Discussion (All)
11:30 R&D Conductor Performance and Production Readiness (V. Lombardo) 4221
12:00 Review Summary (R. Ray) 4228
12:10 Discussion (All)
12:30 Working Lunch (Committee)
13:30 Q&A with Project Team (Committee)
14:00 Executive Session (Committee)
15:30 Closeout (K. Fisher)
16:00 Adjourn

Documents for This Review

Title Mu2e-doc-# Title Mu2e-doc-#
Review charge here Review agenda here
Committee Membership here Project Contact List 245
Conceptual Design Report (CDR) 1169 Summary of Recommendations concerning the solenoid superconductors 4215
 
Concerning the Conductor Procurements:
Conductor Specification Packages 2488 Solenoid Aquisition Oversight Committee Web Page Here
Advanced Acquisition Plan for Solenoid Condoctors 2493 Advanced Procurement Plan for DS Conductor 2474
Advanced Procurement Plan for TS Conductor 2475 Advanced Procurement Plan for PS Conductor 2476
Mu2e Procurement Management Plan 2350 Mu2e Vendor and Sub-Contractor Oversight Plan 2490
 
Concerning the Solenoid Designs:
PS Reference Design 3647 DS Reference Design 3664
PS Drawings and Solid Model 3732 DS Drawings and Solid Model 3733
PS Procurement Specifications 3669 DS Procurement Specifications 3670
PS Requirements 945 DS Requirements 946
TS Preliminary Design 4214
TS Requirements 947
Tolerance studies for the DS 2870 Affect of coil displacements on the magnetic center 2403
Tolerance studies for the TS 2156

Documents from Past Reviews

Title Mu2e-doc-# Title Mu2e-doc-#
Feedback from DOE Briefing (February 2014) 4154 Responses to feedback from DOE Briefing (February 2014) 4155
Feedback from DOE Briefing (September 2013) 3456 Responses to feedback from DOE Briefing (September 2013) 3457
Final report from DOE Mini Review (April 2013) 2938 Responses to recommendations from DOE Mini Review (April 2013) 2939
Final report from DOE Mini Review (November 2012) 2577 Responses to recommendations from DOE Mini Review (November 2012) 2579
Final report from DOE CD-1 Review (June 2012) 2357 Responses to recommendations from DOE CD-1 Review 2358
Final report from CD-1 Director's Review (April 2012) 2209 Responses to recommendations from CD-1 Director's Review 2240
Final report from Independent Design Review (May 2011) 1563 Responses to recommendations from 2011 Independent Design Review 2067
Closeout report from CD-0 review 382 CD-0 Mission Need Statement 720

Jump to: Top of page    Documents for This Review    Agenda and Presentations