At the heart of the Mu2e experiment is a system of three superconducting-solenoid systems. These system represent significant cost, schedule, and technical risk to the project. To help mitigate these risks the Solenoid Acquisition Oversight Committee (Solenoid AOC) was formed. This web page collects information useful to the committee.

The Mu2e Project completed its preliminary design phase and achieved its DOE CD2/3b approval in March 2015. The CD-3b sign-off grants approval for the procurement of the Transport Solenoids (TS). DOE CD-3c, scheduled for summber 2016, will grant approval for the procurement of the Production Solenoid (PS) and the Detector Solenoid (DS).

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (cf. Project Contact List).


Note: documents linked from this page are password protected.

Documents

Title Mu2e-doc-# Title Mu2e-doc-#
 
Regarding the TS Module Solicitation
     
TS Reference Design Report
cf. Mu2e TDR (Ch. 6)
4299 (Draft) Procurement Specifications for TS Coil Modules 5083
TS Coil Module Drawings Example 5081 TS Module Fabrication Procedure 5085
TS Coil Module Instrumentation Description 5105        
 
 
Regarding Prototype and Analysis
     
TS Prototype Module Test Plan 4716 TS Prototype Module Acceptance Plan 4715
Closeout Report from TS Module Independent Design Review 5039 Alignment Studies of the TS Magnetic Center due to Coil Displacements 2403
TS Structural Design and Analysis 5079 TS Fabrication Tolerance Studies 2156
 
 
Regarding Management and Risk
     
Solenoid Vendor Management Plan 4498 Solenoid Risk Analysis 4497
Procurement Management Plan 2350 Risk Management Plan 461
Vendor and Sub-Contract Oversight Plan 2490 Risk Register 4320
 
 
Miscellaneous
     
Technical Design Report 4299 Solenoid Acquisition Oversight Committee Charge & Membership 2437

Reports and Findings

Title Mu2e-doc-# Title Mu2e-doc-#
Agenda and Presentations from 12-Sep-2018 Here Final Report from 12-Sep-2018
Replies
20934
20937
Agenda and Presentations from 26-Jan-2015 Here Final Report from 26-Jan-2015
Replies
5806
5848
Agenda and Presentations from 08-Sep-2014 Here Final Report from 08-Sep-2014
Replies
4656
4657
Agenda and Presentations from 12-Nov-2013 Here Agenda and Presentations from 16-Jan-2014 Here
Agenda and Presentations from 22-Oct-2013 Here Final Report from 22-Oct-2013
Replies
verbal
here
Agenda and Presentations from 18-Mar-2013 Here Final Report from 18-Mar-2013
Replies
2972
3300
Agenda and Presentations from 29-Jan-2013 Here Final Report from 29-Jan-2013
Replies
2712
2808