DOE Independent Project Review of Mu2e Dec 10-12, 2019 |
|
Muon Beamline |
|
The fundamental goal of the Muon Beamline is to deliver a stopped muon rate of
approximately a few times 10E10 per second to the muon stopping target, located in the
Detector Solenoid, and to reduce the background in the tracker, calorimeter and
cosmic ray veto detectors to a level sufficient to achieve the desired experimental
sensitivity.
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Technical Design Report |
4299 |
   |
   |
Milestone Dictionary |
4301 |
WBS Dictionary |
4300 |
Monthly EVMS Performance Report - July |
28056 |
Monthly EVMS Performance Report - August |
28495 |
Monthly EVMS Performance Report - September |
29100 |
Monthly EVMS Performance Report - October |
29919 |
Monthly Performance Graphics |
4659 |
   |
Gantt Chart |
29919 |
Critical Path |
30307 |
Baseline Schedule |
30307 |
Forecast |
29919 |
Monthly RLS Turn-around Status Collection Sheet |
2999 |
Dollarized RAM |
4312 |
Muon Beamline Work Authorization Documents |
List |
Muon Beamline Variance Reports |
List |
Corrective Actions Log |
4930 |
Change Control Procedure |
2971 |
Change Request Log |
4600 |
Change Control Topic |
List |
Change Control by CAM & CA |
Instructions |
Mu2e Risk Register |
4320 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Science Driven Requirements |
4381 |
   |
   |
WBS 05.02 – Muon Beamline Vacuum System |
1481 |
WBS 05.07 – Detector Solenoid Internal Shielding |
1439 |
WBS 05.03 – Collimators |
1044 |
WBS 05.08 – Muon Beam Stop |
1351 |
WBS 05.04 – Upstream External Shielding |
1506 |
WBS 05.09 – Downstream External Shielding |
1371 |
WBS 05.05 – Muon Stopping Target |
1437 |
WBS 05.10 – Detector Support and Installation System |
1383 |
WBS 05.06 – Muon Stopping Target Monitor |
1438 |
Muon Beamline Interface Control Document |
1168 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Detector Rails CRR Report |
24373 |
Response to Recommendation from Detector Rails CRR |
24373 |
Stopping Target & DS Internal Shielding CRR Report |
29928 |
Muon Beam Stop CRR Report |
30037 |
Schedule of Upcoming Construction Readiness Reviews |
List |
Replies to Recommendations from Design Reviews |
6258 |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Mu2e Subsystem Quality Planning Document
|
6005 |
   |
   |
For assistance in obtaining any documentation, references, etc., please contact
mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager
(see Project Contact List).