The fundamental goal of the Muon Beamline is to deliver a stopped muon rate of approximately a few times 10E10 per second to the muon stopping target, located in the Detector Solenoid, and to reduce the background in the tracker, calorimeter and cosmic ray veto detectors to a level sufficient to achieve the desired experimental sensitivity.

Muon Beamline Design, Schedule and Planning Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Technical Design Report 4299      
Milestone Dictionary 4301 WBS Dictionary 4300
Monthly EVMS Performance Report - July 28056 Monthly EVMS Performance Report - August 28495
Monthly EVMS Performance Report - September 29100 Monthly EVMS Performance Report - October 29919
Monthly Performance Graphics 4659   
Gantt Chart 29919 Critical Path 30307
Baseline Schedule 30307 Forecast 29919
Monthly RLS Turn-around Status Collection Sheet 2999 Dollarized RAM 4312
Muon Beamline Work Authorization Documents List Muon Beamline Variance Reports List
Corrective Actions Log 4930 Change Control Procedure 2971
Change Request Log 4600 Change Control Topic List
Change Control by CAM & CA Instructions Mu2e Risk Register 4320

Muon Beamline Requirements & Interface Control Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Science Driven Requirements 4381      
WBS 05.02 – Muon Beamline Vacuum System 1481 WBS 05.07 – Detector Solenoid Internal Shielding 1439
WBS 05.03 – Collimators 1044 WBS 05.08 – Muon Beam Stop 1351
WBS 05.04 – Upstream External Shielding 1506 WBS 05.09 – Downstream External Shielding 1371
WBS 05.05 – Muon Stopping Target 1437 WBS 05.10 – Detector Support and Installation System 1383
WBS 05.06 – Muon Stopping Target Monitor 1438 Muon Beamline Interface Control Document 1168

Muon Beamline Construction Readiness Reviews

Title Mu2e-doc-# Title Mu2e-doc-#
Detector Rails CRR Report 24373 Response to Recommendation from Detector Rails CRR 24373
Stopping Target & DS Internal Shielding CRR Report 29928 Muon Beam Stop CRR Report 30037
Schedule of Upcoming Construction Readiness Reviews List Replies to Recommendations from Design Reviews 6258

Muon Beamline Safety & Quality Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Mu2e Subsystem Quality Planning Document
6005      