CD-1 Review of Mu2eJune 5-7, 2012 |
|
Cosmic Ray Veto |
|
Cosmic ray muons are a known source of potential background for experiments like
Mu2e, and must be suppressed in order to achieve the
sensitivity required by the experiment. Backgrounds induced by cosmic rays can be defeated by
passive shielding, e.g., overburden and thick concrete shielding, and by
an active veto detector whose purpose is to detect penetrating cosmic-ray muons.
|
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Conceptual Design Report (see Chapter 11: Cosmic Ray Veto)
|
1169 |
Cosmic Ray Veto Interface Specifications
|
1551 |
Cosmic Ray Veto WBS Dictionary |
2135 |
Cosmic Ray Veto Milestone Dictionary |
2187 |
Engineering Risk Assessment for the Cosmic Ray Veto |
2137 |
Cosmic Ray Veto Requirements |
944 |
Cosmic Ray Veto Parameters |
862 |
  |
  |
Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.
WBS Number |
Task Name |
Mu2e-doc # |
475.08.01 |
Project Management |
2090
|
475.08.01.02 |
Preliminary and Final Design |
2091
|
475.08.01.03 |
Implementation & Closeout |
2092
|
475.08.02 |
Mechanical Design |
|
475.08.02.01 |
Module Design |
2093
|
475.08.02.02 |
Detector Design and Integration |
2094
|
475.08.02.03 |
Fabricate and Test Counter Prototypes |
2095
|
475.08.02.04 |
Determine cosmic ray background requirements |
2096
|
475.08.03 |
Scintillator Extrusions |
|
475.08.03.01 |
Die design and procurement |
2097
|
475.08.03.02 |
Scintillator extrusion production |
2098
|
475.08.04 |
Fibers |
|
475.08.04.01 |
Waveshifting fiber procurement |
2099
|
475.08.04.02 |
WF quality assurance design and fabrication |
2100
|
475.08.05 |
Photodetectors |
|
475.08.05.01 |
Photodetector procurement |
2101
|
475.08.05.02 |
Photodetector quality assurance design and fabrication |
2102
|
475.08.06 |
Electrical Design |
|
475.08.06.01 |
Front End Electronics |
|
475.08.06.01.01 |
Design and fabricate front-end boards |
2103
|
475.08.06.01.02 |
Front-end boards quality assurance design and fabrication |
2104
|
475.08.06.02 |
Readout Controllers |
|
475.08.06.02.01 |
Design and fabricate readout controllers |
2105
|
475.08.06.02.02 |
Readout controllers quality assurance design and fabrication |
2106
|
475.08.06.03 |
Integration with DAQ |
2107
|
475.08.07 |
Module Fabrication |
|
475.08.07.01 |
Design and Fabrication of Assembly Stations |
2108
|
475.08.07.02 |
Assembly station quality assurance design and fabrication |
2109
|
475.08.07.03 |
Fabrication of module parts |
2110
|
475.08.07.04 |
Module production and testing |
2111
|
475.08.07.05 |
Ship Modules to Fermilab |
2112
|
475.08.08 |
Module Fabrication |
|
475.08.08.01 |
Module support structure |
2113
|
475.08.08.02 |
Module transport jig |
2114
|
475.08.08.03 |
Detector installation |
2115
|