CD-1 Review of Mu2e
June 5-7, 2012

Cosmic Ray Veto

Cosmic ray muons are a known source of potential background for experiments like Mu2e, and must be suppressed in order to achieve the sensitivity required by the experiment. Backgrounds induced by cosmic rays can be defeated by passive shielding, e.g., overburden and thick concrete shielding, and by an active veto detector whose purpose is to detect penetrating cosmic-ray muons.

Cosmic Ray Veto Design, Schedule and Planning Documents

Title Mu2e-doc-# Title Mu2e-doc-#
Conceptual Design Report
(see Chapter 11: Cosmic Ray Veto)
1169 Cosmic Ray Veto Interface Specifications 1551
Cosmic Ray Veto WBS Dictionary 2135 Cosmic Ray Veto Milestone Dictionary 2187
Engineering Risk Assessment for the Cosmic Ray Veto 2137 Cosmic Ray Veto Requirements 944
Cosmic Ray Veto Parameters 862    

Cosmic Ray Veto BOE Documents

Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.

WBS Number Task Name Mu2e-doc #
475.08.01 Project Management 2090
475.08.01.02   Preliminary and Final Design 2091
475.08.01.03   Implementation & Closeout 2092
475.08.02 Mechanical Design
475.08.02.01   Module Design 2093
475.08.02.02   Detector Design and Integration 2094
475.08.02.03   Fabricate and Test Counter Prototypes 2095
475.08.02.04   Determine cosmic ray background requirements 2096
475.08.03 Scintillator Extrusions
475.08.03.01   Die design and procurement 2097
475.08.03.02   Scintillator extrusion production 2098
475.08.04 Fibers
475.08.04.01   Waveshifting fiber procurement 2099
475.08.04.02   WF quality assurance design and fabrication 2100
475.08.05 Photodetectors
475.08.05.01   Photodetector procurement 2101
475.08.05.02   Photodetector quality assurance design and fabrication 2102
475.08.06 Electrical Design
475.08.06.01   Front End Electronics
475.08.06.01.01     Design and fabricate front-end boards 2103
475.08.06.01.02     Front-end boards quality assurance design and fabrication 2104
475.08.06.02   Readout Controllers
475.08.06.02.01     Design and fabricate readout controllers 2105
475.08.06.02.02      Readout controllers quality assurance design and fabrication 2106
475.08.06.03   Integration with DAQ 2107
475.08.07 Module Fabrication
475.08.07.01   Design and Fabrication of Assembly Stations 2108
475.08.07.02   Assembly station quality assurance design and fabrication 2109
475.08.07.03   Fabrication of module parts 2110
475.08.07.04   Module production and testing 2111
475.08.07.05   Ship Modules to Fermilab 2112
475.08.08 Module Fabrication
475.08.08.01   Module support structure 2113
475.08.08.02   Module transport jig 2114
475.08.08.03   Detector installation 2115

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (see Project Contact List).