CD-1 Review of Mu2eJune 5-7, 2012 |
|
Tracker |
|
The Mu2e tracker provides the primary momentum measurement for conversion
electrons. The tracker must identify and measure 105 MeV/c
electrons while rejecting backgrounds, and it must provide this functionality while situated in the warm, evacuated bore of a superconducting solenoid that
provides a uniform magnetic field of 1 Tesla.
|
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Conceptual Design Report (see Chapter 9: Tracker)
|
1169 |
Tracker Interfaces
|
1562 |
WBS Dictionary for Tracker
|
2157 |
Milestone Dictionary for Tracker
|
2158 |
Engineering Risk Assessment for the Tracker
|
2223 |
Tracker Requirements
|
732 |
Existing supporting documentation is either bundled with its associated BOE documents or referenced within them.
WBS Number |
Task Name |
Mu2e doc # |
475.06.01 |
Project Management |
2165
|
475.06.01.02 |
Requirements |
2166
|
475.06.02 |
Straws |
|
475.06.02.01 |
Mechanical R&D |
2167
|
475.06.02.02 |
Time Division R&D |
2168
|
475.06.02.03 |
Straw Stringing |
2169
|
475.06.03 |
Straw Assemblies |
|
475.06.03.01 |
Plane R&D |
2170
|
475.06.03.02 |
Gas Manifold |
2171
|
475.06.03.03 |
Station Prototype |
2172
|
475.06.03.04 |
Mechanical Support (for the full tracker) |
2173
|
475.06.03.05 |
General |
2174
|
475.06.04 |
Front End Electronics |
|
475.06.04.01 |
Preamp |
2175
|
475.06.04.02 |
Digitizer |
2176
|
475.06.04.03 |
Readout Controller |
2177
|
475.06.04.04 |
Test Stands |
2178
|
475.06.05 |
Infrastruture |
|
475.06.05.01 |
Gas System |
2179
|
475.06.05.02 |
High Voltage System |
2180
|
475.06.05.03 |
Low Voltage System |
2181
|
475.06.05.04 |
Cooling |
2182
|
475.06.05.05 |
Cabling and Control |
2183
|
475.06.06 |
Detector Assembly and Installation |
2184
|