Tracker Oversight Committee    Documentation Home Page

The Mu2e Project completed its preliminary design phase and achieved its DOE CD-2/3b sign-off in March 2015. Critical to the experiment is the Straw Tube Tracking detector, which provides the primary momentum measurement of the outgoing electron in the Muon to electron conversion. The tracker must identify and measure 105 MeV/c electrons while rejecting backgrounds, and it must provide this functionality while situated in the evacuated bore of the superconducting solenoid that provides a uniform 1 Tesla magnetic field. The tracker system represent significant cost, schedule, and technical challenges to the project. To help mitigate these technical risks, the Tracker Oversight Committee (TOC) was formed. This web page collects information useful to the committee.

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the L2 manager Aseet Mukherjee

Note: documents linked from this page are password protected.

Committee Members:

Hans Danielsson (CERN): Chair

Hogan Nguyen (FNAL)

Brendan Casey (FNAL)

Rick Van Berg (U of Penn)

Charge (also in Mu2e-doc-5473)

Meeting 1 (via video to U. Penn and CERN)

15 June 2015, 9:00 (Fermilab time)

Location at Fermilab: Lab 5

Minutes and Questions

Response to Questions

Meeting 2 (via video to U. Penn and CERN)

12 August 2015, 9:00 (Fermilab time)

Location at Fermilab: Lab 5

Minutes and Questions

Response to Questions

Meeting 3 (at Fermilab)

30 October 2015, 9:00 (Fermilab time)

Location: Lab 5, Lab 3, and FCC

Minutes and Questions

Response to Questions

 

 

Additional Documents

Mu2e-doc-#

 

Design and Requirements

 

 

Tracker Reference Design Report
(Mu2e TDR Ch. 8)

4299

 

Science Driven Requirements

4381

Tracker Requirements

732

 

Tracker Front End Electronics Requirements
(preamp, digitizer, readout controller)

3879

 

 

 

 

T-Tracker Basic Geometry

888

 

Readout Controller Specifications

3973

 

 

Digitizer Scheme

4085

 

 

 

 

 

 

Previous Reviews

 

 

 

23 Apr 2014

 

 

 

Questions and Replies

4112

 

 

Final Report

4138

 

 

 

 

 

 

Report and Findings

 

Last modified: 07/04/2017|