Solenoids Construction Readiness Reviews
|
Documentation Home Page |
|
The Mu2e project received CD-3c approval from the DOE on July 14, 2016, allowing the project to start construction of the Tracker subsystem components. Before initiating fabrication, a Construction Readiness Review is required to confirm the soundness and completeness of the design, the procurement and quality assurance plans as well as the coherence of all interfaces with respect to neighboring sub-detectors. Peer reviews of the key elemenents of the project in advance of approval to construct is part of this process.
The solenoids perform several critical functions for the Mu2e experiment.
Magnetic fields generated from these magnets are used to efficiently collect and transport muons from the production target to the muon stopping target while
minimizing the transmission of other particles.
This web page collects information useful to the Construction Readiness Review committees.
For assistance in obtaining any documentation, references, etc., please contact
mu2ewebmaster@fnal.gov. For document content questions, please contact
the appropriate L2 manager (cf. Project Contact List).
|
Note: documents linked from this page are password protected.
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Mu2e DocDB Agenda Superconductor CD-3a Charge |
4204 |
TS Coil Module CRR Membership |
Here |
Mu2e DocDB Agenda SC CD-3a/CRR Website |
Website |
Superconductor CD-3a/CRR |
Website |
SC CD-3a/CRR Final Report |
4317 |
SC CD-3a/CRR Response to Recommendations |
4316 |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Mu2e DocDB Agenda TS Coil Module Charge |
5929 |
TS Coil Module CRR Membership |
Here |
Mu2e DocDB Agenda TS Coil Module CRR Website |
Website |
TS Coil Module CRR |
Website |
TS Coil Module CRR Final Report |
6102 |
   |
   |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
TS Cryostat CRR1 Charge |
8512 |
TS Cryostat CRR1 Membership |
Here |
Mu2e DocDB Agenda TS Cryostat CRR1 Website |
Website |
|
|
Time |
Title |
Speaker |
Mu2e-doc-# |
   |
08:00 |
TS Overview |
(V. Lombardo) |
8542 |
   |
8:30 |
Mu2e TS Warm Bore & Inner Thermal Shield Documentation |
(T. Nicol) |
8426 |
   |
9:30 |
Break |
   |
   |
   |
9:45 |
TS Assembly Tooling |
(J. Brandt) |
8515 |
  |
10:15 |
Discussion/Executive Session |
  |
   |
   |
12:00 |
Lunch |
   |
   |
   |
13:30 |
Closeout |
  |
   |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Transport Solenoid Requirements |
947 |
Mu2e TS Preliminary Design Report |
4214 |
List of TS inner Cryostat Eng Drawings/Docs in Teamcenter |
8515 |
   |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
TS Cryostat CRR1 Final Report |
8653 |
Responses to Recommenations from TS Cryostat CRR1 |
9474 |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Cryo Distribution CRR Charge |
8652 |
Cryo Distribution CRR Membership |
Here |
Mu2e DocDB Agenda Cryo Distribution CRR Website |
Website |
|
|
Time |
Title |
Speaker |
Mu2e-doc-# |
   |
   |
09:00 |
Cryo Feedbox & Transfer Line Intro |
(R. Schmitt) |
8574 |
   |
   |
9:30 |
Feedbox |
(T. Tope) |
8575 |
   |
   |
10:30 |
Break |
   |
   |
   |
   |
10:45 |
Transfer Line |
(J. Kilmer) |
8576 |
   |
   |
11:30 |
Discussion |
   |
   |
   |
   |
12:00 |
Lunch |
   |
   |
   |
   |
13:00 |
Executive Session |
   |
   |
   |
   |
15:30 |
Closeout |
   |
8740 |
   |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Mu2e Cryogenic Distribution Requirements |
1244 |
Mu2e Cryo Distribution Design Review Report |
7029 |
TS Feed Box Peer Review |
8683 |
Feed Box Tech Specs for RFP |
8688 |
Feedbox Design/Analysis Docs |
8695 |
Transfer Line/Design/Analysis Docs |
8693 |
Cryo Distribution System P&ID (incl. MC-1 and A0) |
4520 |
QA plan for Inside Transfer Lines |
8687 |
Mu2e Solenoid Interface Control Document |
1470 |
   |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Cryo Distribution CRR Final Report |
8827 |
Responses to Recommenations from the Cryo Distribution CRR |
9477 |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Slow Monitoring CRR Charge |
15552 |
Slow Monitoring CRR Membership |
Here |
Mu2e DocDB Agenda Slow Monitoring CRR Website |
Website |
|
|
Time |
Title |
Speaker |
Mu2e-doc-# |
   |
08:00 |
Solenoids QPM Slow Monitoring |
(D. Orris) |
15549 |
   |
9:00 |
Slow Monitoring |
(I. Young) |
15630 |
   |
10:30 |
Break |
   |
   |
   |
10:00 |
Discussion/Exec Session/Lunch |
   |
   |
  |
13:00 |
Closeout |
  |
15693 |
  |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Mu2e Slow Monitoring Design Requirements |
7125 |
Mu2e Slow Monitoring Design Review Report |
6620 |
Slow Monitoring Network Architecture |
15471 |
DS-PS Wensor Wires and Connector Specs |
8076 |
Slow Monitoring Wiring Diagram |
15627 |
Slow Monitoring BOM |
15468 |
QPS Clean Power Distribution & Grounding |
15540 |
QPS Rack Layout |
15537 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Slow Monitoring CRR Final Report |
16304 |
Responses to Recommenations from the Slow Monitoring CRR |
16502 |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
TS Cryostat CRR2 Charge |
15174 |
TS Cryostat CRR2 Membership |
Here |
Mu2e DocDB Agenda TS Cryostat CRR2 Website |
Website |
|
|
Time |
Title |
Speaker |
Mu2e-doc-# |
   |
08:00 |
TS Overview for TS Cryostat CRR2 |
(A. Hocker) |
15809 |
   |
8:30 |
TS Cryostat |
(T. Nicol) |
15801 |
   |
9:30 |
Break |
   |
   |
   |
9:45 |
TS Interfaces |
(J. Brandt) |
15261 |
   |
10:45 |
TS Assembly Outer Cryostat/td>
| (P. Schlabach) |
15768 |
   |
11:45 |
Lunch |
   |
   |
   |
13:00 |
Exec Session |
   |
   |
   |
15:00 |
Closeout |
  |
15842 |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
TS Requirements |
947 |
TS Preliminary Design Report |
4214 |
TS Cryostat Final Design Review Report |
14026 |
TS Vacuum Vessel, Cold Mass Support & Thermal Shield Design Report |
13196 |
Solenoid Interface Control Document |
1470 |
TS Coil Module Support Procurement Plan |
15258 |
TS Vacuum Vessel & Outer Thermal Shield QA/QC |
14319 |
TS Vacuum Vessel & Outer Thermal Shield Procurement Plan |
14367 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
TS Cryostat CRR2 Final Report |
16490 |
Responses to Recommenations from the TS Cryostat CRR2 |
16499 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
   |
   |
Technical Design Report |
4299 |
Science Driven Requirements |
4381 |
   |
   |
Quench Protection System Requirements |
1238 |
Detector Solenoid Requirements |
946 |
   |
   |
Transport Solenoid Collimators Requirements |
1129 |
Transport Solenoid Requirements |
947 |
   |
   |
Production Solenoid Heat and Radiation Shield Requirements |
1092 |
Production Solenoid Requirements |
945 |
   |
   |
Power Supply System Requirements |
1237 |
Magnetic Field Measurement Requirements |
1275 |
   |
   |
Mu2e Cryogenic Distribution Requirements |
1244 |
Solenoid Interface Control Document |
1470 |
   |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
  Concerning the Conductors: |
|
|
|
Advanced Acquisition Plan for Solenoid Conductors |
2493 |
Conductor Specification Packages |
2488 |
R&D Conductor Performance and Production Readiness |
4221 |
   |
   |
  Concerning the Production Solenoid: |
|
|
|
Advanced Acquisition Plan for the PS |
3019 |
PS Reference Design |
3647 |
PS Drawings and Solid Model |
3732 |
PS Procurement Specifications |
3669 |
  Concerning the Detector Solenoid: |
|
|
|
Advanced Acquisition Plan for the DS |
3021 |
DS Reference Design |
3664 |
DS Drawings and Solid Model |
3733 |
DS Procurement Specifications |
3670 |
DS Tolerance studies |
2870 |
   |
   |
  Concerning the Transport Solenoid:
| |
|
|
Advanced Acquisition Plan for the TS |
4309 |
TS Preliminary Design |
4214 |
TS Tolerance Studies |
2156 |
Effect of coil displacements on the magnetic center |
2403 |
TS Module Procurement Specification |
5083 |
TS Module Acceptance Test Plan |
5148 |
  Concerning the Cryogenic Distribution System:
| |
|
|
Feedbox Design Requirements |
5139 |
Cryogenic Distribution P&ID |
4520 |
Cryo Distribution System Review |
Website |
   |
   |
  Concerning the Quench Protection & Monitoring System:
| |
|
|
Quench Protection Technical Requirements Specs |
6578 |
Quench Protection Interface to Power Supplies |
6605 |
Quench Protection Commissioning Requirements |
6599 |
Slow Monitoring Design Requirements |
7125 |
  Concerning the Field Mapping System:
| |
|
|
DS/PS Mechanical Design |
6690, 6691 |
Hall Probe Fixtures/Calib Equip |
6693, 6694 |
Survey and alignment |
6696 |
QA Plan |
7205 |
  Concerning the Power Supplies:
| |
|
|
Technical Documentation |
6394 |
   |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Replies to Recommendations from Design Reviews |
6258 |
   |
   |
PS/DS Design Review Report |
7198 |
Production Solenoid & Detector Solenoid 50% Design Review Report |
7079 |
Transport Solenoid Cryostat Design Review Report |
7105 |
Transport Solenoid Modules Design Review Report |
5039 |
Transport Solenoid Construction Readiness Review Report |
6102 |
Solenoid Quench Detection System Design Review Report |
6705 |
Cryo Distribution System Design Review Report |
7029 |
Field Mapping System Design Review Report |
6967 |
Solenoid Power System Design Review Report |
6476 |
Solenoid Slow Monitoring & Cryo Controls Design Review Report |
6620 |
Solenoid Acquisition Oversight Committee |
Website |
   |
   |
Title
| Mu2e-doc-# |
Title |
Mu2e-doc-# |
Mu2e Subsystem Quality Planning Document
|
6005 |
   |
   |
For assistance in obtaining any documentation, references, etc., please contact
mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager
(see Project Contact List).
Top of page