Tracker Construction Readiness Reviews
Documentation Home Page |
The Mu2e project received CD-3c approval from the DOE on July 14, 2016, allowing the project to start construction of the Tracker subsystem components. Before initiating fabrication, a Construction Readiness Review is required to confirm the soundness and completeness of the design, the procurement and quality assurance plans as well as the coherence of all interfaces with respect to neighboring sub-detectors. Peer reviews of the key elemenents of the project in advance of approval to construct is part of this process. The primary purpose of the Mu2e tracker is to provide the primary momentum measurement of the outgoing electron in muon-to-electron conversion. The tracker must identify and reconstruct the trajectories of 105 MeV/c electrons while rejecting backgrounds and it must provide this functionality while located in the evacuated warm bore of the superconducting solenoid that provides a uniform 1 Tesla magnetic field. Details of the Tracker can be found in the Mu2e Technical Design Report [1]. The tracker has a low material budget to reduce multiple scattering and a low outgassing and low leak rate requirement to reduce the impact on the vacuum system. These criteria set challenging requirements on the tracker subsystem. For assistance in obtaining any documentation, references, etc., please contact mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager (cf. Project Contact List). |
Note: documents linked from this page are password protected.
A dcoument explaining the goals for CRRs is found here
A checklist for Electronics CRRs is found here
A checklist for Mechanical CRRs is found here
Title | Mu2e-doc-# | Title | Mu2e-doc-# | Straw Construction Readiness Review Charge | 7936 | Straw CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Committee Executive Session | |||
9:00 | Introduction | A. Mukherjee | 7959 | |
9:15 | Straw Quality Assurance & Acceptance Plan | D. Ambrose | 7954 | |
9:50 | Processing of Straws into Panels | J. Bono | 7934 | |
10:20 | Coffee Break | |||
10:40 | Straw Procurement Strategy & Documentation | A. Mukherjee | 7960 | |
11:00 | Committee Executive Session | |||
12:30 | Closeout | 20538 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Straw CRR Report | 8092 | Response to Recommendations | 9471 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | Panel Assembly Readiness Review Charge | 19738 | Panel CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
16:00 | Tour of the Tracker Panel Factory | K. Heller |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Committee Executive Session | |||
9:00 | Introduction | A. Mukherjee | 20008 | |
9:30 | Tracker Assembly | G. Gallo | 3982 | |
10:00 | Coffee Break | |||
10:15 | Panel Assembly | K. Heller | 19978 | |
10:45 | QC & Shipping | J.F. Caron | 19972 | |
11:15 | Panel Survey | C. Wang | 19996 | |
12:15 | Q&A/Discussion | |||
12:30 | Lunch | |||
13:30 | Plane Assembly, Infrastructure & Storage | M. Yucel | 19984 | |
14:15 | Electronics | V. Rusu | 19990 | |
14:45 | Q&A/Discussion | |||
15:00 | Committee Executive Session | |||
16:00 | Closeout |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Panel CRR Report | 20592 | Response to Recommendations | 20595 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | Panel Assembly Follow-Up Readiness Review Charge | 28971 | Panel CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
8:00 | Committee Executive Session | |||
9:00 | Tracker Panel Overview: Response to CRR1 Recommendations & Progress Since Last Review | A. Mukherjee | 29493 | |
9:20 | Tracker Panel Overview: Institutional Responsibilities & Parts Flow | A. Mukherjee | 29496 | |
09:45 | Panel Assembly Overview & Experience from the Pilot Run | K. Heller | 29499 | |
10:00 | Fabrication Procedures - Straw Epoxying | K. Ciampa | 29502 | |
10:15 | Fabrication Procedures/Tooling - Anchors & Low Temp Solder | M. Frand | 29505 | |
10:35 | Panel Assembly - Summary & Q&A | K. Heller | 29508 | |
10:45 | Coffee Break | |||
11:05 | QA/QC Overview & GUIs (UMN) | D. Ambrose | 29511 | |
11:20 | Panel QC - Tensioning (UMN) | K. Ciampa | 29514 | |
11:30 | QC After Panel Completion (UMN) | R. Wildberger | 29517 | |
11:45 | QC Q&A (UMN) | D. Ambrose | ||
11:55 | Tracker - QA/QC (York, Duke & FNAL) | S. Oh | 29520 | |
12:20 | Tracker Panel Tests - Vacuum & Pressure | M. Yucel | 29523 | |
12:40 | Tracker Panel Infrastructure & Interfaces | M. Yucel | 29526 | |
13:00 | Lunch/Committee Working Lunch | |||
14:30 | Tour of the Tracker Panel Factory | K. Heller | ||
15:30 | Coffee Break | |||
15:45 | Tracker Panel Electronics | V. Rusu | 29565 | |
16:00 | Tracker Panel Electronics Testing | Y. Sun | 29532 | |
16:30 | Committee Executive Session | |||
18:30 | Adjourn |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Response to Questions | A. Mukherjee/K. Heller | 29535 | |
9:30 | Panel Survey | S. Oh | 29538 | |
10:00 | Plane Assembly, Infrastructure & Storage | M. Yucel | 29541 | |
10:45 | Coffee Break | |||
11:00 | Databases | K. Heller/D. Ambrose | 29544 | |
11:20 | Schedule & Plan Moving Forward (including risks/mitigations) | A. Mukherjee/K. Heller | 29547 | |
12:15 | Q&A/Discussion | |||
13:00 | Lunch | |||
14:00 | Executive Session | |||
16:00 | Closeout | B. Casey | 29559 | |
16:30 | Adjourn |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Panel Follow-Up CRR Report | 30040 | Response to Recommendations | 30542 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | Preamp Construction Readiness Review Charge | 38175 | Panel Mini-CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
11:00 | Committee Executive Session | |||
11:10 | Tracker Preamp | V. Rusu | 38130 | |
12:25 | Preamp Fabrication & Testing | Y. Kolomensky | 38199 | |
12:55 | Lunch | |||
13:15 | Q&A | |||
14:00 | Committee Executive Session - Closed |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Tracker FEE Requirements | 3879 | Preamp PCB Review Response to Recommendations | 38136 |
Preamp Custom Connectors | 38127 | Preamp Checkout Procedures & Acceptance Testing | 38124 |
Preamp PCB Specifications | 38112 | FEE Radiation Tests | 11381 |
Power Measurements | 8866 | Noise Measurements | 27058 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Preamp CRR Final Report | 38136 | Response to Recommendations | 38136 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | DRAC Construction Readiness Review Charge | 41364 | DRAC CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Committee Executive Session | |||
9:00 | Introduction | B.Tschirhart | 41448 | |
9:15 | DRAC Performance | R.Bonventre | 41472 | |
9:50 | Addressing Charge Questions and PCB & preCRR Recommendations | V. Rusu | 41463 | |
10:20 | Coffee Break | |||
10:50 | DRAC Quality Assurance & Acceptance Plan | Y. Kolomensky | 41475 | |
11:10 | DRAC Fabrication, Procurement Strategy & Documentation | V. Rusu | 41466 | |
11:30 | Committee Executive Session | |||
12:30 | Q & A session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Tracker FEE Requirements | 3879 | DRAC PCB Review Response to Recommendations | 38684 |
Tracker DRAC and AMB preCRR checklist | 40941 | DRAC and AMB preCRR presentation | 40830 |
Vertical Slice Tests | 37352 | DRAC Radiation Tests | 11381 |
Thermal Management | 36530 | Production Plans, Checkout procedures adn QA | 40760 |
DRAC QA Process | 41430 | DRAC Teststand requirements | 41424 |
B-field effect from tracker electronics | 41427 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
DRAC CRR Report | 42412 | Response to Recommendations | 49139 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | AMB Construction Readiness Review Charge | 43493 | AMB CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Committee Executive Session | |||
9:00 | Introduction | B.Tschirhart | 43695 | |
9:15 | Addressing Charge Questions and PCB & preCRR Recommendations | V. Rusu | 43689 | |
9:45 | AMB Quality Assurance & Acceptance Plan | Y. Kolomensky | 43698 | |
10:05 | Coffee Break | |||
10:35 | AMB Performance | D. Brown | 41865 | |
11:10 | AMB Fabrication, Procurement Strategy & Documentation | V. Rusu | 43692 | |
11:30 | Committee Executive Session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Tracker FEE Requirements | 3879 | AMB PCB Review Response to Recommendations | 40824 |
Thermal Management | 40775 | AMB preCRR presentation | 43653 |
Vertical Slice Tests | 37352 |    |    |
AMB QA Process | 38199, 41424, 40760 |    |    |
B-field effect from tracker electronics | 41427 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
AMB CRR Report | 44095 | Response to Recommendations | 44115 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | HV LV Construction Readiness Review Charge | 45095 | HV LV CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Committee Executive Session | |||
9:00 | Introduction | B.Tschirhart | 45212 | |
9:15 | HV LV module Quality Assurance & Acceptance Plan | K. Heller | 45216 | |
9:45 | HV LV Design, Fabrication, Procurement Strategy and Documentation | V. Rusu | 45214 | |
10:30 | Coffee Break | |||
10:45 | HV LV Performance and answering charge questions (including PCB review) | V. Rusu | 45164 | |
11:30 | Committee Executive Session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Tracker Requirements | 732 | HVLV Pre-CRR Presentation | 44376 |
Printed Circuit Review Introduction | 45116 | IFB board and flange | 39609 |
Power Distribution Scheme | 88666 | Tracker Cabling in the Trench | 35912 |
Tracker IFB Flange Modeling Cables | 44373 | Report on last Summer's studies | 42749 |
Approved ORCs (2005,3568,3932) | 20601 | Engineering Note for the IFB Flange | 45138 |
Design, Performance and Charge Questions | 45164 | QA & QC | 45141, 45165 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HV LV CRR Report | 45933 | Response to Recommendations | 49142 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | HV LV Construction Readiness Review Charge | 48741 | HV LV CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
8:30 | Committee Executive Session | |||
9:00 | Introduction | B.Tschirhart | 48774 | |
9:15 | Performance and thermal management | TBD | 48774 | |
9:45 | Quality Assurance & Acceptance Plan | V. Rusu | 48774 | |
10:15 | Coffee Break | |||
10:30 | Design, Fabrication, Procurement Strategy and Documentation | V. Rusu | 48774 | |
11:00 | Answering pre-CRR and charge questions | V. Rusu | 48774 | |
11:30 | Committee Executive Session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Tracker Requirements | 732 | HVLV Pre-CRR Presentation | 48612 |
System Overview | 30505 | temperature requirements | 44499 |
Key Board functionality | 43529 | HV Connector | 48603 |
DCDC PCB Review | 47984 | Schematics and gerber files | 48745 |
Quality control plan | 48738 | DCDC converter QA/QC | 48735 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HV LV CRR Final Report | 49100 | Response to Recommendations | XXXX |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | Gas and Gas Infrastructure Construction Readiness Review Charge | 49901 | Gas and Gas Infrastructure CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
9:00 | Committee Executive Session (closed session) | |||
9:30 | Introduction | B.Kiburg | 49937 | |
9:45 | Overvie of the gas system | V. Fisher | 49940 | |
10:00 | Gas system design and operation | E. Voirin | 49952 | |
10:40 | Risks and Failure Modes | J. Kintner | 49952 | |
11:00 | Coffee Break | |||
11:15 | Quality Assurance and Acceptance Plan | J. Kintner | 49916 | |
11:30 | Fabrication, Procurement Stategy and Documentation | J. Kintner | 49952 | |
11:45 | Answering pre-CRR and charge questions | J. Kintner, E. Voirin, V. Fischer | 49952 | |
12:05 | Committee Executive Session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Tracker Requirements | 732 | System Overview | 45068 |
Gas distribution system P and ID | 49907 | Tracker Interface Control Document | 1562 |
Muon Beamline Interface Control Document | 1168 | Mu2e interface Control Documents Approval status | link |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Gas and Gas Infrastructure Final Report | XXXX | Response to Recommendations | XXXX |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
  Tracker Panel Standard Operating Procedures (SOP) |
  |   |   |
Straw Panel Production SOPs | 20038 |    |    |
Straw Prep SOP: Automated Straw Resistance | 18984 | Straw Prep SOP: Silver Epoxy Application | 18981 |
Panel Assembly SOP: Day 1 Inner Ring Installation | 18975 | Straw Prep SOP: C02 Straw Leak Testing | 18972 |
Straw Prep SOP: Straw Cutting | 18969 | Straw Prep SOP: C02 Endpiece | 18966 |
  Tracker Design and Requirements |
  |   |   |
Tracker Reference Design Report cf. Mu2e TDR (Ch. 8) |
4299 | Science Driven Requirements | 4381 |
Tracker Requirements | 732 | Tracker Front End Electronics Requirements | 3879 |
T-Tracker Basic Geometry | 888 | Readout Controller Specifications | 3973 |
Digitizer Scheme | 4085 | Tracker Interfaces | 1562 |
Plane Assembly | 29310 | Tracker Infrastructure (HV/LV/Fibers/gas) | 29313 |
Requirements Sign-Off Procedure | 3083 | Requirements Circulate-to and Sign-Off List | 3624 |
Mu2e Interface Matrix | 4411 | Requirements & Interface Approval Sign-Off | List |
Task Breakdown and Facilities | 4635 | Risk Register | 4320 |
  Construction Readiness Reviews |
  |   |   |
CRR Guidelines | 7790 |   |   |
  ESH&Q |
  |   |   |
ESH&Q Site Visit Summary | ESH&Q Site Visit Reports | U of Minn | |
Quality Assurance Plan | 6005 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# | |
  Previous Reviews & TRKTOC Minutes |
  |   |   | |
Final report from DOE mini-IPR2018 Review (June 12, 2018) | 18024 | Responses to recommendations from DOE mini-IPR2018 Review (June 12, 2018) | 7728 | |
Final report from DOE IPR2017 Review (July 25-27, 2017) | 12317 | Responses to recommendations from DOE IPR2017 Review (July 25-27 2017) | 12403 | |
Final report from the Tracker Straw CRR (Sept 2, 2016) | 8092 | Responses to recommendations from the Tracker Straw CRR (Sept 2, 2016) | 9471 | |
Final report from Director-s pre-CD-3c Review (April 2016) | 7315 | Responses to recommendations from Director's pre-CD-3c Review (April 2016) | 7330 | |
Final report from DOE CD-2/3b Follow-up Review (February 2015) | 5144 | Responses to recommendations from DOE CD-2/3b Follow-up Review (February 2015) | 7062 | |
Director's pre-CD-2/3b Review Closeout Report - 22 July, 2014 | 4404 | Replies to Recommendations from Director's pre-CD-2/3b Review - 22 July, 2014 | 4405 | |
DOE CD-2/3b Review Closeout Report - 21-24 October, 2014 | 5035 | Replies to Recommendations from DOE CD-2/3b Review - 21-24 October, 2014 | 5040 | |
Tracker Digitizer Review - 23-24 April, 2014 | 4112 | Tracker Digitizer Review Final Report - 23-24 April, 2014 | 4138 | |
Tracker Design Review Report - 29 February-1 March, 2016 | 7032 | Replies to Recommendations from Design Reviews - 29 February-1 March, 2016 | 6258 | |
Director's pre-CD-3c Review Closeout Report - 19-21 April, 2016 | 7315 | Replies to Recommendations from Director's pre-CD-3c Review - 19-21 April, 2016 | 7330 | |
DOE CD-3c Review Closeout Report - 14-17 June, 2016 | 7651 | Replies to Recommendations from DOE CD-3c Review - 14-17 June, 2016 | 7728 | |
Tracker Technical Oversight Committee Meetings | Here |   |   |