Calorimeter Construction Readiness Reviews |
|
Documentation Home Page |
|
The primary purpose of the Mu2e calorimeter is to provide a second set of measurements that complement the information from the tracker. This additional information contributes robustness to track reconstruction, provides a trigger that is independent of the tracker and contributes to particle ID that can identify cosmic ray muons that are not tagged by the Mu2e Cosmic Ray Veto. The calorimeter consists of two disks of pure CsI crystals equipped with a pair of large-area SiPMs. It operates inside the evacuated warm bore of a 1 Tesla superconducting solenoid. The radiation dose seen by the calorimeter is position dependent and ranges up to 6 krad/crystal/year.
The Mu2e project received CD-3 approval from the DOE on July 14, 2016. The project is finalizing its designs and preparing to start construction. External peer reviews of key technical elements of the project are a part of this process.
For assistance in obtaining any documentation, references, etc., please contact
mu2ewebmaster@fnal.gov. For document content questions, please contact
the appropriate L2 manager (cf. Project Contact List).
|
Note: documents linked from this page are password protected.
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Charge for the Constr Readiness Review of the Calorimeter Crystals & Photosensors |
10973 |
Crystal & SiPM CRR Membership |
Here |
Zoom Video Conferencing Information |
Here |
   |
   |
Time |
Title |
Speaker |
Mu2e-doc-# |
8:00 |
Committee Executive Session |
|
|
8:30 |
Calorimeter Overview for SiPMs & Crystals |
S. Miscetti |
10997 |
|
9:00 |
Crystal Requirements and Technical Specs |
D. Hitlin |
11054 |
|
9:30 |
Mechanical Test of Crystals |
F. Happacher |
11015
| |
10:00 |
QA of optical parameters for crystals |
S. Giovannella |
10991
| |
10:30 |
Radiation Hardness & Radiation Induced Noise of Crystals |
R.Y.Zhu |
11009 |
|
11:10 |
Coffee Break |
|
|
11:30 |
SiPM Requirements & Technical Specs |
I. Sarra |
11006 |
|
11:55 |
SiPM QA |
G. Pezzullo |
11021 |
|
12:20 |
SiPM Radiation Tests |
E. Diociaiuti |
11003 |
|
12:45 |
Lunch |
|
|
14:00 |
Discussion/Q&A |
   |
   |
   |
16:00 |
Committee Executive Session (Closed) |
|
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
CsI & SiPM CRR Closeout Report |
12209 |
Responses to Recommendations from the CsI & SiPM CRR |
12230 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Crystal Specifications |
7051
| Dimensional Control of the CsI Crystals |
11096 |
Photosensor Specifications |
7052 |
QA/QC Procedures |
7053
|   |
Particle ID Requirements |
4256 |
Particle ID algorithm |
4375
|   |
Ionizing dose and neutron flux simulation |
8314
| Crystal Irradiation Tests at INFN |
5800 |
Source Test of CsI and BaF2 crystal - INFN |
5817 |
Results of Electron Beam Test for CsI+MPPC |
5816 |
Electronics Integration and Grounding |
5339 |
FEA Analysis of Calorimeter Structure |
6766 |
Measurement of CsI Slow Component |
6813 |
Calorimeter Seeded Track Reconstruction |
6358 |
Advanced Aquistion Plan - Calorimeter Crystals |
10275 |
Advanced Acquisition Plan - Calorimeter Photosensors |
10281 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Charge for the Constr Readiness Review of the Calorimeter Mechanics |
26004 |
Calorimeter Mechanics CRR Membership |
Here |
Zoom Video Conferencing Information |
Here |
   |
   |
Time |
Title |
Speaker |
Mu2e-doc-# |
8:30 |
Committee Executive Session |
|
|
9:00 |
Overview of the Calorimeter Systems |
S. Miscetti |
26184 |
|
9:25 |
Overview of Calorimeter Mechanics |
F. Happacher |
26211 |
|
9:50 |
Calorimeter Design, Alignment, Services and Assembly |
A. Saputi |
26196 |
|
10:30 |
Coffee Break |
|
|
11:00 |
Calorimeter Cooling |
F. Raffaelli |
26187 |
|
11:35 |
Cable routing of FEE |
D. Pasciuto |
24483 |
|
12:05 |
Materials Outgassing |
S. Miscetti |
26208 |
|
12:25 |
Inner Ring, Front Panel and Composite Materials |
F. Raffaelli |
26190 |
|
12:55 |
Lunch |
|
|
14:00 |
Services & Grounding |
I. Sarra |
26100 |
|
14:20 |
Installation & Maintenance |
A. Saputi |
26214 |
|
14:40 |
Source System |
F. Porter |
26073 |
|
15:10 |
Discussion/Q&A |
|
|
16:00 |
Executive Session (closed) |
|
|
17:00 |
Adjourn |
|
|
Time |
Title |
Speaker |
Mu2e-doc-# |
8:30 |
Response to Overnight Questions |
Calorimeter Team |
26238 |
|
9:30 |
Committee Executive Session |
|
|
12:00 |
Adjourn |
|
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Cal Mechanics CRR Closeout Report |
30182 |
Responses to Recommendations from the Cal Mechanics CRR |
30161 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Calorimeter Composition, Envelope & Geometry |
25935
| Calorimeter Aluminum Support Disk |
25893
|
Calorimeter Mechanical Components |
22220
| Calorimeter FEE Disk |
24744
|
Calorimeter Cooling Lines |
24747
| Calorimeter Crates |
24750
|
Calorimeter Mechanics Source System |
12464, 26094
| Calorimeter Inner Ring/Composites |
25929
|
Calorimeter Crystal Dimensions |
20859
| Calorimeter Stacking Tolerances |
22223
|
Routing of cable services: IFB-CAL and FeedThrough |
25956
| Cables and Cable Routing |
25953
|
Response of Calo Disk Supports to DS Quench |
23203
| Quench Effect on Calo Disks |
21522
|
Assembly Procedure & Test in SiDet |
26076
| Detailed Drawings of the Calo Mechanics |
Outbox Link
|
Standards for Construction Readiness Reviews |
7790
|     |
    |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Charge for the Constr Readiness Review of the Calorimeter FEE |
29850 |
Calorimeter FEE CRR Membership |
Here |
Zoom Video Conferencing Information |
Here |
   |
   |
Time |
Title |
Speaker |
Mu2e-doc-# |
9:00 |
Committee Executive Session (Closed) |
|
|
9:10 |
Calorimeter Overview |
S. Miscetti |
29913 |
|
9:40 |
FEE Design & Rad Tests |
G. Corradi |
29910 |
|
10:40 |
Coffee Break |
|
|
11:00 |
Dubna QA Tests |
N. Atanov |
29820 |
|
11:30 |
Cable routing of FEE |
S. Miscetti/D. Pasciuto |
29916 |
|
12:00 |
Lunch |
|
|
13:00 |
PCB Details |
|
|
14:00 |
Discussion/Q&A |
|
|
14:30 |
Executive Session (closed) |
|
|
15:30 |
Adjourn |
|
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Cal FEE CRR Closeout Report |
30218 |
Responses to Recommendations from the Cal FEE CRR |
30364 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
  Calo FEE board PCB Review Report |
29853
|   Response to Recommendation - Paaschen Study |
27936
|
  Pre-CRR Report on Calo FEE |
29826
|   Tech Spec of Calo FEE boards & cables |
29817
|
  Slice Test: Post-Test Beam & Cosmic Test 2018 |
21360
| Slice Test:FEE Tests |
26514
|
  Slice Test: Test with FEE-MB-DIRAC v1 |
26986
|   Slice Test: Test with FEE-MB-DIRAC v1 |
29208
|
  Slice Test: Test with Irradiated SiPMs |
29277
|   FEE Irradiation: Summary Nov 2018 & Jan 2019 |
24486
|
  FEE Irradiation: SEU Test of FEE+MB |
25506
|   FEE Irradiation: Summary of Irradiation, June 2019 |
27043
|
  QA/QC for the Calo FEE boards and FEE cables |
29823
| QA/QC Procedures |
7053
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Charge for the Constr Readiness Review of the Calorimeter MBE |
39417 |
Calorimeter MB CRR Membership |
Here |
Time |
Title |
Speaker |
Mu2e-doc-# |
8:30 |
Committee Executive Session (Closed) |
|
|
8:40 |
Calorimeter Overview |
S. Miscetti |
39444 |
|
9:00 |
Technical description of the MB |
S. Ceravolo |
39447 |
|
9:30 |
MB Irradiation |
D. Paesani |
39453 |
|
10:00 |
Coffee Break |
|
|
10:15 |
MB Firmware |
D. Paesani |
39450 |
|
10:45 |
Module-0 Operations |
E. Diociaiuti |
39456 |
|
11:15 |
Discussion/Q&A |
|
|
11:45 |
Lunch |
|
|
12:15 |
Executive Session (closed) - if needed |
|
|
13:00 |
Adjourn |
|
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Cal MB CRR Closeout Report |
39579 |
Responses to Recommendations from the Cal FEE CRR |
39579 |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Standards for Construction Readiness Reviews |
7790
| MB Technical Specifications |
35436
|
Report from the PCB Review of Preamp & MB |
29853
| PCB Review Reply to Recommendations |
36923
|
Vertical Slice Test Presentations (1) |
36117,
36420,
36607,
37313
| Vertical Slice Test Presentations (2) |
37854,
38238,
38399,
38573
|
Rad tolerance test TID (MB+FEE) |
34352
| Rad Tolerance neutrons @ FNG |
38229
|
Neutron Induced SEE on FEE/MB |
38900
| Power Consumption |
39060
|
MB Test in B-Field |
38070
| Test Stand Studies |
39027
|
QA/QC for MB |
39018
|    |
   |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Charge for the Constr Readiness Review of the Calorimeter DIRC |
45966 |
Calorimeter DIRAC CRR Membership |
Here |
Time |
Title |
Speaker |
Mu2e-doc-# |
1:00 |
Committee Executive Session (Closed) |
|
|
1:30 |
Introduction to the Calorimeter |
F. Spinella |
46118 |
|
1:50 |
Introduction to DIRAC |
F. Spinella |
46136 |
|
3:00 |
Coffee Break |
|
|
3:15 |
DIRAC Performance and Qualification Tests |
Franco Spinella |
46148 |
|
4:00 |
Discussion - QA |
Elena Pedreschi |
|
|
4:15 |
Exec Session |
|
|
4:30 |
Adjourn |
|
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Cal DIRAC CRR Closeout Report |
XXXX |
Responses to Recommendations from the Cal DIRAC CRR |
XXXX |
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
Standards for Construction Readiness Reviews |
7790
| DiRAC_V3 Design files and Board Manufacturing |
46121
|
DiRAC_V31 |
46124
| Replay DiRAC PCB review |
40908
|
Mech and Thermal Documentation for Calorimeter DiRAC |
40926
| CRR Checklist DiRAC recommendations |
46130
|
QAQC EMC DiRAC |
46133
| Rad Tolerance neutrons @ FNG |
38229
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
  Calorimeter Design and Requirements |
  |
  |
  |
Calorimeter Reference Design Report cf. Mu2e TDR (Ch. 9) |
4299 |
Science Driven Requirements |
4381 |
Calorimeter Requirements |
864 |
Calorimeter Interfaces |
2195
|
Quality Assurance Plan |
6005 |
Mu2e Risk Register |
4320
|
Title |
Mu2e-doc-# |
Title |
Mu2e-doc-# |
  Previous Calorimeter Review |
  |
  |
  |
Calorimeter Mechanical Design Review Closeout |
9450 |
Calorimeter Technical Review Closeout |
5759 |
DOE IPR 2018 Closeout |
21078 |
DOE IPR 2017 Closeout |
12317 |