Accelerator Construction Readiness Reviews

Documentation Home Page

The Mu2e project received CD-3c approval from the DOE on July 14, 2016, allowing the project to start construction of the Tracker subsystem components. Before initiating fabrication, a Construction Readiness Review is required to confirm the soundness and completeness of the design, the procurement and quality assurance plans as well as the coherence of all interfaces with respect to neighboring sub-detectors. Peer reviews of the key elemenents of the project in advance of approval to construct is part of this process.

The success of the Mu2e experiment critically depends on the performance of the Accelerator. Mu2e requires a high intensity, pulsed proton beam to produce an intense beam of low energy muons with the time structure required by the experiment. The muon beam on the Mu2e stopping target is derived from the decay of pions produced by the interaction of an intense 8-GeV kinetic energy proton beam with a tungsten target.

The Mu2e Accelerator Infrasturcture consists of the following subsystems: Resonant Extraction, Delivery Ring RF, Mu2e External Beamline, Extinction System, Extinction Monitor System, Production Target and Target Handling System, Radiation Safety and Shielding, Beamline Instrumentation and Controls, Diagnostic Beam Absorber, and Proton Target Beam Absorber. The Accelerator systems represent significant cost, schedule, and technical challenges to the project. This web page collects information useful to the Construction Readiness Review committees.


For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (cf. Project Contact List).


Note: documents linked from this page are password protected.

Radiation Safety Review - CRR1

Radiation Safety CRR1 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Radiation Safety Construction Readiness Review Charge (CRR1) 7980 Radiation Safety CRR1 Membership Here

Radiation Safety CRR1 Agenda for 14 September, 2016 13:00-15:00 (Chicago Time)
Meeting Location - Wilson Hall 15 SW "Aquarium"

Time Title Speaker Mu2e-doc-#
13:00 Executive Session (Closed)      
13:10 Radiation Safety Improvements (T. Leveling) 7871
13:40 Executive Session Committee  
14:40 Closeout     

Additional Documents for the Radiation Safety CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
Radiation Safety Documentation for CRR1 7871      

Rad Safety Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Radiation Safety & Shielding CRR1 Closeout Report 9345      

External Beamline Review - CRR1

External Beamline CRR1 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
External Beamline Construction Readiness Review Charge (CRR1) 8000 External Beamline CRR1 Membership Here

External Beamline CRR1 Agenda for 21 September, 2016 9:00-12:00 (Chicago Time)
Meeting Location - Wilson Hall 2NW "Black Hole"

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:15 Mu2e Accelerator: External Beamline Overview (S. Werkema) 8004
9:45 External Beamline (D. Still) 8004
10:30 Executive Session Committee  
11:45 Closeout     

Additional Documents for the External Beamline CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
External Beamline Documentation for CRR1 8004      

Ext Beamline CRR1 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
External Beamline CRR1 Closeout Report 8062 Responses to Recommendations from the External Beamline CRR1 9483

Heat & Radiation Shield CRR1

HRS CRR1 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Heat & Radiation Shield Construction Readiness Review Charge (CRR) 8419 HRS CRR1 Membership Here

HRS CRR1 Agenda for 1-2 February, 2017
Day 1: 9:00am-5:00pm (Chicago Time)
Meeting Locations: 9:00-13:00 Wilson Hall 1 East; 13:00-17:00 WH8X Hornet's Nest

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:30 HRS Design Overview (R.Coleman) 8444
10:00 Coffee Break      
10:30 HRS Schedule (S. Werkema) 8449
11:00 Heat & Radiation Shield Design (L. Bartoszek) 8442
11:45 Lunch      
13:00 More Heat & Radiation Shield Design (L. Bartoszek) 8442
13:45 Coffee Break      
14:10 Heat & Radiation Shield Installation (L. Bartoszek) 8442
15:40 Executive Session      
17:00 Adjourn      

Day 2: 9:00-12:00 (Chicago Time)
Meeting Location: 9:00-12:00 - Wilson Hall 1 East

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:30 Response to Reviewers Questions      
11:30 Closeout      

Additional Documents for the HRS CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
HRS Requirements 1092 HRS Drawings 3926
Adv. Aquisition plan/Bid Evaluation Criteria 7457 HRS QC Plan/Assembly Doc 7095
Production Solenoid Reference Design 3647      

HRS CRR1 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
HRS CRR1 Closeout Report 8571 Responses to Recommendations from the HRS CRR1 9489

Extinction Collimation System CRR1

Extinction Collimation System CRR1 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Collimation System Construction Readiness Review Charge (CRR1) 8854 Extinction Collimation System CRR1 Membership Here
Indico Extinction Collimation System CRR1 Website Website

Extinction Collimation System CRR1 Agenda for 20 February, 2017
9:00-13:00 (Chicago Time)
Meeting Location: SkyBox (NML-2S)

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:20 Extinction System Collimators Overview/Response to Recommendations (E. Prebys) 8726
9:40 Design/Procurement Plan (V. Sidirov) 8725
10:20 Coffee Break      
10:35 Executive Session (Closed)
12:00 Closeout

Additional Documents for the Extinction Collimation System CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Collimation System Fabrication Specifications 8723 Extinction Collimation System Procurement Specifications 8723

Extinction Collimation System CRR1 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Collimation System Closeout Report 9357 Responses to Recommendations from the Extinction Collimation System CRR 9534

Resonant Extraction System Magnets CRR-II

Resonant Extraction System Magnets CRR-II Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Magnets Construction Readiness Review Charge (CRR-II) 8839 Res Extraction System Magnets CRR-II Membership Here

Resonant Extraction System Magnets CRR-II Agenda for 8 March, 2017
13:00-17:00 (Chicago Time)
Meeting Location: Comitium (WH2SE)

Time Title Speaker Mu2e-doc-#
13:00 Executive Session (Closed)      
13:30 Resonant Extraction Overview (V. Nagaslaev) 8956
14:00 Coffee Break      
14:30 Resonant Extraction System Magnets (V. Nagaslaev) 8956
15:30 Executive Session (Closed)
15:30 Closeout

Additional Documents for the Res Extraction CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Design Review Report 7073 Resonant Extraction System Magnet Specs 8125
Resonant Extraction Specifications 7025 Sextupole Magnets BOE 3515
Resonant Extraction System Magnet QA Plan 8125 Resonant Extraction System Magnet Procurement Plan 8125

Resonant Extraction CRR1 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Closeout Report 9291 Responses to Recommendations from the Resonant Extraction System CRR 11126

Extinction Monitor System CRR2

Extinction Monitor System CRR2 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Monitor System Construction Readiness Review Charge (CRR2) 10068 Extinction Monitor System CRR2 Membership Here
Indico Extinction Monitor System CRR1 Website Website

Extinction Monitor System CRR2 Agenda for 12 May, 2017
8:30-14:30 (Chicago Time)
Meeting Location: WH1E

Time Title Speaker Mu2e-doc-#
8:30 Executive Session (Closed)      
9:00 Extinction Monitor Overview (P. Kasper) 10215
9:30 Mechanical Design and Installation (L. Bartoszek) 10218
10:15 Discussion      
10:30 Coffee
10:45 Pixel Assembly and Commissioning (A.Gaponenko) 10227
11:15 Discussion      
11:30 Electronics and DAQ (M. Jones) 10224
12:00 Discussion      
12:30 Working Lunch      
14:00 Questions & Answers

Additional Documents for the Extinction Collimation System CRR2

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Monitor Documentation 10068

Extinction Monitor System CRR2 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Monitor System Closeout Report 11102 Responses to Recommendations from the Extinction Monitor System CRR 11105

Protection Collimator CRR

Protection Collimator CRR Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Protection Collimator Construction Readiness Review Charge 13218 Protection Collimator CRR Membership Here

Protection Collimator CRR Agenda for 2 Oct, 2017
8:30-17:00 (Chicago Time)
Meeting Location: Hornet's Nest (WH8X)

Time Title Speaker Mu2e-doc-#
8:30 Executive Session (Closed)      
9:00 Protection Collimator Requirements (V. Nagaslaev) 12539
9:30 Protection Collimator Design (D. Mitchell) 12539
10:30 Coffee
10:50 Protection Collimator Procurement Plan (D. Pushka) 12539
11:30 Discussion      
12:00 Working Lunch      
13:00 Questions & Answers
14:00 Executive Session

Additional Documents for the Protection Collimator CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Protection Collimator Requirements 2897 Protection Collimator Eng Req & Specs 2902
Accelerator Interfaces 1529 Protection Collimator Interfaces 13022
Protection Collimator Procurement Specifications 13148 Responses from Previous Review Recommendations 6597

Protection Collimator CRR Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Protection Collimator Closeout Report 14715 Responses to Recommendations from the Protection Collimator CRR 14718

Ext Beam, Rad Safety and Instr & Controls CRR

Ext Beam, Rad Safety and Instr & Controls CRR Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Ext Beam, Rad Safety and Instr & Controls CRR Charge 13317 Ext Beam, Rad Safety and Instr & Controls CRR Membership Here

External Beams, Radiation Safety and Instrumentation & Controls CRR Agenda for 16 Oct, 2017
8:30-17:00 (Chicago Time)
Meeting Location: The Huddle (8:30am-5pm)

Time Title Speaker Mu2e-doc-#
8:30 Executive Session (Closed)      
9:00 External Beamlines (D. Still) 12749
10:00 Coffee
10:15 Radiation Safety (T. Kroc) 13526
11:15 Instrumentation & Controls (B. Drendel) 8134
12:15 Working Lunch      
13:15 Questions & Answers
14:15 Executive Session

Additional Documents for the Ext Beamline, Radiation Safety and Instrumentation & Controls CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Accelerator Requirements 1374 Accelerator Interfaces 1529
Instrumentation & Controls Specs & Interfaces 7124 QA/QC Instrumentation & Controls 11948
Radiation Safety Specifications & Interfaces 7072 Ext Beam line Trim PS Specifications 12266
M4 Vacuum Design Component List (Redesign after flood) 12844 M4 Power Supply Support Document 3590
External Beamlines- Magnet Power Supply Requirements 3612 M4 Beamline Magnet Names, Operating Currents and Lattice 3375
M4 External BeamLine Vacuum System Requirements 3596 External Beamline Construction Readiness Review 8004
Radiation Safety Technical Design Review Link Ext Beam and Instrumentation & Controls Technical Design Review Link
Standards for the Mu2e Construction Readiness Reviews 7790 Responses from Previous Review Recommendations 6258

Ext Beamline, Rad Safety and Instrumentation & Controls CRR Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Ext Beamline, Rad Safety and Instrumentation & Controls CRR Closeout Report 14418 Responses to Recommendations from the Ext Beamline, Rad Safety and Instrumentation & Controls CRR CRR 20586

Heat & Radiation Shield (CRR2)
Shipping Frame / Lifting Fixture & Installation Machine

HRS CRR2 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
HRS CRR2 Charge 13529 HRS CRR2 Membership Here

HRS (CRR2): Shipping Frame/Lifting Fixture & Installation Machine
Agenda for 30-31 Oct, 2017

Day 1: 8:30am-5pm (Chicago Time)
Meeting Location (Day 1): Hornet's Nest (WH8X) (8:30am-1pm), Black Hole (WH2NW) (1pm-5pm)

Time Title Speaker Mu2e-doc-#
8:30 Executive Session (Closed)      
9:00 Intro - HRS Requirements (S. Werkema) 13314
9:30 HRS Installation (L. Bartoszek) 13314
10:30 Coffee
10:50 Procurement Plan, QA Specs and Bid Eval Plan (D. Pushka) 13314
11:10 Responses to Previous Recommendations (D. Pushka) 13314
11:30 Integration Model (D. Pushka) 13314
11:40 Installation Machine Calculations (L. Bartoszek) 13314
12:00 Lunch      
13:00 HRS Shipping Frame/Lifting Fixture (I. Fang) 13314
13:20 HRS Pressure Vessel - Changes since CRR1 (D. Pushka) 13314
13:50 Questions & Answers
14:30 Executive Session

Day 2: 9:00-12:00 (Chicago Time)
Meeting Location (Day 2): Hornet's Nest (WH8X) (9am-noon)

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:30 Response to Reviewers Questions      
11:30 Discussion with Proponents      

Additional Documents for the HRS CRR2

Title Mu2e-doc-# Title Mu2e-doc-#
HRS Requirements 1092 HRS Drawings 3926
HRS Shipping Frame Connection Forces 13118 HRS Pressure Vessel Calculations 10164
Prelim Results from HRS Shipping Frame FEA 12722 HRS Under Differential Pressure 12197
HRS Installation Machine Drawings 12710 HRS Shipping Frame Drawings 10377
Manufacturing Drawings for HRS-D 3926 Hand Calculations for HRS Transp & Install Fixtures 13010
Adv. Procurement plan for the HRS 8561 HRS Pressure Vessel & Assembly QC Spec 12659
Production Solenoid Reference Design 3647 HRS CRR1 Closeout Report 8571
Accelerator Requirements 1374 Accelerator Interfaces 1529
Standards for the Mu2e Construction Readiness Reviews 7790 Responses from Previous Review Recommendations 6258

HRS CRR2 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
HRS Lifting Fixture Closeout Report 14178 Response to Recommendations from the HRS Lifting FixtureCRR2 20589

Delivery Ring Low Level RF (CRR)

Delivery Ring Low Level RF CRR Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Delivery Ring LLRF Charge 14163 Delivery Ring LLRF CRR Membership Here

Delivery Ring Low Level RF CRR Agenda for 7 Nov, 2017
1pm-3pm (Chicago Time)
Meeting Location: Race Track (WH7X)

Time Title Speaker Mu2e-doc-#
13:00 Delivery Ring Low Level RF (J. Dey) 14187

Additional Documents for the Delivery Ring LLRF CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Standards for the Mu2e Construction Readiness Reviews 7790 Responses from Previous Review Recommendations Here
Beam Studies for Delivery Ring 7582 Delivery Ring LLRF System 7176
Delivery Ring LLRF System Specifications 7295      

Delivery Ring LLRF CRR Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Delivery Ring LLRF Closeout Report 14754 Response to Recommendations from the Delivery Ring CRR LLRF 20580

Extinction System CRR3 - Ext Monitor Filter

Extinction Monitor Filter CRR3 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Monitor Filter Construction Readiness Review Charge (CRR3) 19486 Extinction Monitor Filter CRR3 Membership Here
Indico Extinction System CRR3 Website Website

Extinction Monitor Filter CRR3 Agenda for Aug 15, 2018
13:00-17:00 (Chicago Time)
Meeting Location: Libra (WH9SE)

Time Title Speaker Mu2e-doc-#
13:00 Executive Session (Closed)      
13:15 Extinction Monitor System Filter Overview (P. Kasper) 19576
13:45 Extinction Monitor Filter Design (L. Bartoszek) 19570
15:15 Coffee Break      
15:35 Q&A
16:00 Executive Session (closed)
17:00 Adjourn

Additional Documents for the Extinction Collimation System CRR3

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Monitor Filter Drawings 18945 Mu2e Extinction Monitor Requirements 894
Mu2e QA Plan 677 Mu2e QA Subsystem Planning Document 6005
Mu2e Extinction Monitor Interfaces 1529 Mu2e Conventional Construction Interfaces 1537
Mu2e Procurement Plan 2350

Previous Extinction Collimation System Closeout Reports

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Collimation System Closeout Report - CRR1 9357 Extinction Collimation System Closeout Report - CRR2 11102

Extinction Monitor Filter Closeout Reports

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction Montitor Filter Closeout Report - CRR3 21324 Responses to Recommendations from the Extinction Monitor Filter CRR3 22079

Resonant Extraction System Electronics CRR-III

Resonant Extraction System Electronics CRR-III Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Electronics Construction Readiness Review Charge (CRR-III) 21051 Res Extraction System Electronics CRR-III Membership Here

Resonant Extraction System Electronics CRR-III Agenda for 15 October, 2018
10:00-12:30 (Chicago Time)
Meeting Location: Conjectorium (WH3E)

Time Title Speaker Mu2e-doc-#
10:00 Executive Session (Closed)      
10:15 Introduction to Resonant Extraction & Spill Regulation (V. Nagaslaev) 21183
10:55 Coffee Break      
11:15 Spill Regulation System (P. Prieto) 21183
11:55 Executive Session (Closed)
12:30 Closeout

Additional Documents for the Res Extraction CRR3

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Design Review Report 7073 Resonant Extraction Specifications 7025
Spill Regulation System Specifications 20871 Spill Regulation System Architecture 20871

Resonant Extraction CRR3 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Closeout Report 24196 Response to Recommendations from the Resonant Extraction System CRR 41100

External Beamline Review: Final Focus - CRR3

External Beamline CRR3 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
External Beamline Construction Readiness Review Charge (CRR3) 24202 External Beamline CRR3 Membership Here

External Beamline CRR3 Agenda for 26 February, 2019 13:00-17:00 (Chicago Time)
Meeting Location - Penthouse (Booster West Tower)

Time Title Speaker Mu2e-doc-#
13:00 Executive Session (Closed)      
13:15 Ext Beamline Final Focus Scope (Magnets, Vacuum System & Installation) (D. Still) 21030
14:30 Coffee Break      
14:45 Q&A Session      
15:00 Executive Session (Closed)      

Additional Documents for the External Beamline CRR3

Title Mu2e-doc-# Title Mu2e-doc-#
External Beamline Documentation for CRR3 21030      

Ext Beamline CRR3 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
External Beamline CRR3 Closeout Report 30179 Response to Recommendations from the External Beamline CRR3 CRR 30502

Resonant Extraction Magnet Power Supplies CRR-4

Resonant Extraction Magnet Power Supplies CRR-4 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Power Supplies Construction Readiness Review Charge (CRR-4) 26316 Res Extraction System Electronics CRR-4 Membership Here

Resonant Extraction System Power Supplies CRR-4 Agenda for 4 June, 2019
08:00-11:00 (Chicago Time)
Meeting Location: Race Track (WH7XO)

Time Title Speaker Mu2e-doc-#
08:00 Executive Session (Closed)      
8:15 Overview of the Resonant Extraction System & Power Supplies (V. Nagaslaev) 26337
8:45 Power Supplies for the Resonant Extraction Magnets (D. Barak) 26340
9:45 Coffee Break      
10:00 Executive Session (Closed)      
11:00 Adjourn

Additional Documents for the Res Extraction CRR4

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Design Review Report 7073 Resonant Extraction Specifications 7025
Resonant Extraction Power Supply Documentation 25947      

Resonant Extraction CRR4 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System PS Closeout Report 26721 Response to Recommendations frmo the Resonant Extraction System PS CRR 41100

Extinction System CRR4 - AC Dipoles

Extinction System AC Dipole CRR4 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction System AC Dipoles Construction Readiness Review Charge (CRR4) 26385 Extinction System AC Dipoles CRR4 Membership Here

Extinction AC Dipole System CRR4 Agenda for 5 June, 2019
9:00-17:00 (Chicago Time)
Meeting Location: One East (WH1E)

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:30 AC Dipole CRR - Overview, Scope & Requirements (D. Still) 26427
9:50 Extinction Overview (S. Werkema) 26436
10:10 AC Dipole Magnet - 0.5m Prototype Measurements (L. Elementi) 26445
10:25 AC Dipole Magnet - 1m Prototype Measurements (H. Pfeffer) 26433
10:45 Coffee Break      
11:00 Ferrite Measurements (L. Elementi) 26448
11:20 Ferrite Modeling (Iouri Terechkine) 26439
11:50 AC Dipole Vacuum Testing (Mayling Wong-Squires) 25335
12:15 Lunch
13:15 AC Dipole Magnet Design (A. Makarov) 21039
13:45 Procurement Plan (D. Harding) 26424
14:05 Answers to Charge Questions (D. Still) 26430
14:25 Q&A Session
14:55 Executive Session (Closed)

Additional Documents for the Extinction System AC Dipole CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction System AC Dipole Documentation 25548        

Extinction System AC Dipole Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction System AC Dipole Closeout Report 26860 Response from the Extinction System AC Dipole CRR 30511

Radiation Safety Imrpovements Review - CRR3

Radiation Safety CRR3 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Radiation Safety Construction Readiness Review Charge (CRR3) 27804 Radiation Safety CRR3 Membership Here

Radiation Safety CRR3 Agenda for 1 August, 2019 10:00-12:00 (Chicago Time)
Meeting Location - CS/Boardroom (WH5SW)

Time Title Speaker Mu2e-doc-#
10:00 Executive Session (Closed)      
10:05 CRR3a for Radiation Safety Improvements (T. Kroc) 26553
10:15 Summary of Previous Shielding Analysis of AP30 Region (T. Kroc) 26553
10:30 CRR3a - Design Overview, Procurement & Installation Plan (C. Crowley) 26553
11:00 Q&A      
11:15 Executive Session Committee  
12:00 Adjourn     

Additional Documents for the Radiation Safety CRR1

Title Mu2e-doc-# Title Mu2e-doc-#
Radiation Safety Documentation for CRR3 26553      

Rad Safety Improvements CRR3 Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Radiation Safety & Shielding CRR3 Closeout Report 28188 Response to Recommendations from the Radiation Safety & Shielding CRR3 XXXX

Production Target CRR

Production Target CRR Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Production Target Construction Readiness Review Charge 30808 Production Target CRR Membership Here

Production Target CRR Agenda for 15 January, 2020 08:00-12:00 (Chicago Time)
Meeting Location - Disappearance Room (WH13SW)

Time Title Speaker Mu2e-doc-#
08:00 Executive Session (Closed)      
08:30 Production Target (Hayman 2)-Requirements & Design (D. Pushka) 30814
09:30 Target FEA (I. Fang) 30817
10:30 Coffee/Q&A      
11:00 Executive Session/Writing Committee  
12:00 Adjourn     

Resonant Extraction - Electrostatic Septum CRR

Resonant Extraction - Electrostatic Septum CRR Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Electrostatic Septum Construction Readiness Review Charge 36605 Electrostatic Septum Membership Here

Electrostatic Septum CRR Agenda for 11 February, 2021
9:00-16:30 (Chicago Time)
Meeting Location: Zoom only (Zoom info sent via email)

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed) (R. Rucinski) 36980   
9:30 Introduction to Resonant Extraction System and the ESS Specifications (V. Nagaslaev) 36288
10:00 ESS Prototype Design & Performance (V. Nagaslaev) 36288
10:30 Coffee Break      
10:45 Production ESS Design (M. Alvarez) 36288
11:30 ESS Fabrication (M. Alvarez) 36288
12:00 Q&A
12:15 Lunch
13:00 ESS Installation (N. Curfman) 36288
13:20 Infrastructure and Management (V. Nagaslaev) 36288
14:05 Q&A
14:20 Executive Session (Closed)
16:00 Closeout
16:30 Adjourn

Additional Documents for the Electrostatic Septum CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction System Design Review Report 7073 Resonant Extraction Specifications 7025

Electrostatic Septum CRR Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Resonant Extraction ESS CRR Closeout Report 41097 Response to Recommendations from the Resonant Extraction ESS CRR 41100

Additional Documents for the Electrostatic Septum CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Standards for the Mu2e Construction Readiness Reviews 7790 Mu2e Risk Register 4320
Accelerator Interface Control Document 1529 Accelerator Interface Sign-Offs sign-offs

Target RH Transfer Cart & RHR Shield Door CRR

Target RH Transfer Cart & RHR Shield Door CRR Charge

Title Mu2e-doc-# Title Mu2e-doc-#
RH Cart & RHR Shield Door Construction Readiness Review Charge 37860 RH Cart & RHR Shield Door Membership Here

RH Cart & Shield Door CRR Agenda for 22 April, 2021
9:00-14:00 (Chicago Time)
Meeting Location: Zoom only (Zoom info sent via email)

Time Title Speaker Mu2e-doc-#
9:00 Executive Session (Closed)      
9:15 RHR Shield Door & Air Seal & RH Transfer Cart: Design, Risk Mitigation & Fabrication Plans (D. Pushka) 37782
10:45 Coffee Break      
11:00 Q&A      
11:45 Lunch
12:30 Executive Session (Closed)
13:30 Closeout
14:00 Adjourn

Additional Documents for the RH Cart & RHR Shield Door CRR

Title Mu2e-doc-# Title Mu2e-doc-#
FMEA for Shield Door, Air Seal & Transfer Cart 37782 Shield Door & Air Seal Procurement Plan 37782
Shield Door & Air Seal Reactions & Nodal Forces 14412 RH Shield Door Fabrication Drawings 8068
RH Transfer Cart Procurement Plan 37782 Transfer Cart Stress & Displacement Analysis 14232

RH Cart & RHR Shield Door CRR Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
RH Cart & RHR Shield Door CRR Closeout Report CRR Closeout Report 38777 Response to Recommendations from the RH Cart & Shield Door CRR XXXX

Additional Documents for the RH Cart & RHR Shield Door CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Standards for the Mu2e Construction Readiness Reviews 7790 Mu2e Risk Register 4320
Accelerator Interface Control Document 1529 Accelerator Interface Sign-Offs sign-offs

Extinction System CRR5 - AC Dipole Power Supplies

Extinction System AC Dipole Power Supplies CRR5 Charge

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction System AC Dipole Power Supplies Construction Readiness Review Charge (CRR5) 47056 Extinction System AC Dipole Power Supplies CRR5 Membership Here

Extinction AC Dipole Power Supplies CRR5 Agenda for 15 Nov, 2023
8:30-12:00 (Chicago Time)
Meeting Location: Dark Side (WH6NW)

Time Title Speaker Mu2e-doc-#
8:30 Executive Session (Closed)      
9:00 Overview of Extinction AC Dipole System (D. Still & S. Werkema) 43117
9:20 AC Dipole Power Supplies (Low Freq (300kHz) and High feq (4.4Mhz)) - Overview, Scope & Requirements (D. Barak) 43117
10:30 Coffee Break      
10:45 Quality and Procurement Plan (D. Barak) 43117
11:15 Answers to Charge Questions (D. Still and D. Barak) 43117
11:30 Questions and Answers Session
11:45 Executive Session (Closed)

Additional Documents for the Extinction System AC Dipole Power Supplies CRR

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction System AC Dipole Documentation 25548 Extinction System AC Dipole Power Supply Documentation 43117

Extinction System AC Dipole Power Supply Closeout Report

Title Mu2e-doc-# Title Mu2e-doc-#
Extinction System AC Dipole Closeout Report 47242 Response from the Extinction System AC Dipole CRR XXXX

Additional Accelerator Documents & Presentations

Title Mu2e-doc-# Title Mu2e-doc-#
 
Accelerator Design and Requirements
     
Mu2e Technical Design Report [Accelerator (Ch. 4)] 4299 Science Driven Requirements 4381
Proton Beam Absorber Requirements 948 Beam Extinction Requirements 1175
Production Solenoid Heat and Radiation Shield Requirements 1092 Production Target Requirements 887
Proton Beam Requirements 1105 Extinction Monitor Requirements 894
Protection Collimator Requirements 2897 Accelerator Interface Control Document 1529

Previous Reviews

Title Mu2e-doc-# Title Mu2e-doc-#
Final report from DOE CD-3c Review (July 14-16, 2016) 7967 Responses to recommendations from DOE CD-3c Review (July 14-16 2016) 7728
Director's pre-CD-2/3b Review Closeout Report - 22 July, 2014 4404 Replies to Recommendations from Director's pre-CD-2/3b Review - 22 July, 2014 4405
DOE CD-2/3b Review Closeout Report - 21-24 October, 2014 5035 Replies to Recommendations from DOE CD-2/3b Review - 21-24 October, 2014 5040
Director's pre-CD-3c Review Closeout Report - 19-21 April, 2016 7315 Replies to Recommendations from Director's pre-CD-3c Review - 19-21 April, 2016 7330
DOE CD-3c Review Closeout Report - 14-17 June, 2016 7651 Replies to Recommendations from DOE CD-3c Review - 14-17 June, 2016 7728
Resonant Extraction Review (Aug 25-27, 2015) Here Final Report from 27-Aug-2015
Replies
7073
Beamline, Controls & Instrumentation Review (Oct 6-7, 2015) Here Final Report from 7-Oct-2015
Replies
6239
Accelerator Radiation and Safety Improvements Review (Oct 20, 2015) Here Final Report from 20-Oct-2015
Replies
6438
Extinction and Extinction Monitoring Review (Nov 2-3, 2015) Here Final Report from 3-Nov-2015
Replies
6356
Target, Target Handling, and HRS Review (Nov 16-18, 2015) Here Final Report from 18-Nov-2015
Replies
6853
Delivery Ring RF Review (Nov 23, 2015) Here Final Report from 23-Nov-2015
Replies
6861
Protection Collimator Review (Jan 19, 2016) Here Final Report from 19-Jan-2016
Replies
6597

Standards for Mu2e Construction Readiness Reviews: Mu2e-doc-7790

Mu2e Construction Readiness Reviews - Recommendations Tracking Table: Mu2e-doc-11663

Mu2e Design Reviews - Recommendations Tracking Table: Mu2e-doc-6258

Review materials can be found here: Mu2e Review Indico Sites



Fermilab at Work ]  [ Mu2e Home ]  [ Mu2e @ Work ]  [ Mu2e DocDB ]  [ Mu2e Search ]

For web related questions: Mu2eWebMaster@fnal.gov.
For content related questions: werkema@fnal.gov
This file last modified Friday, 31-May-2024 07:45:45 CDT
Security, Privacy, Legal Fermi National Accelerator Laboratory
Last modified: 05/31/2024 |