Accelerator Construction Readiness Reviews |
Documentation Home Page |
The Mu2e project received CD-3c approval from the DOE on July 14, 2016, allowing the project to start construction of the Tracker subsystem components. Before initiating fabrication, a Construction Readiness Review is required to confirm the soundness and completeness of the design, the procurement and quality assurance plans as well as the coherence of all interfaces with respect to neighboring sub-detectors. Peer reviews of the key elemenents of the project in advance of approval to construct is part of this process.
The success of the Mu2e experiment critically depends on the performance of the Accelerator. Mu2e requires a high intensity, pulsed proton beam to produce an intense beam of low energy muons with the time structure required by the experiment. The muon beam on the Mu2e stopping target is derived from the decay of pions produced by the interaction of an intense 8-GeV kinetic energy proton beam with a tungsten target. The Mu2e Accelerator Infrasturcture consists of the following subsystems: Resonant Extraction, Delivery Ring RF, Mu2e External Beamline, Extinction System, Extinction Monitor System, Production Target and Target Handling System, Radiation Safety and Shielding, Beamline Instrumentation and Controls, Diagnostic Beam Absorber, and Proton Target Beam Absorber. The Accelerator systems represent significant cost, schedule, and technical challenges to the project. This web page collects information useful to the Construction Readiness Review committees. For assistance in obtaining any documentation, references, etc., please contact mu2ewebmaster@fnal.gov. For document content questions, please contact the appropriate L2 manager (cf. Project Contact List). |
Note: documents linked from this page are password protected.
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Radiation Safety Construction Readiness Review Charge (CRR1) | 7980 | Radiation Safety CRR1 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
13:00 | Executive Session (Closed) |    |    |
13:10 | Radiation Safety Improvements | (T. Leveling) | 7871 |
13:40 | Executive Session | Committee |   |
14:40 | Closeout |   |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Radiation Safety Documentation for CRR1 | 7871 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Radiation Safety & Shielding CRR1 Closeout Report | 9345 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
External Beamline Construction Readiness Review Charge (CRR1) | 8000 | External Beamline CRR1 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:15 | Mu2e Accelerator: External Beamline Overview | (S. Werkema) | 8004 |
9:45 | External Beamline | (D. Still) | 8004 |
10:30 | Executive Session | Committee |   |
11:45 | Closeout |   |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
External Beamline Documentation for CRR1 | 8004 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
External Beamline CRR1 Closeout Report | 8062 | Responses to Recommendations from the External Beamline CRR1 | 9483 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Heat & Radiation Shield Construction Readiness Review Charge (CRR) | 8419 | HRS CRR1 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:30 | HRS Design Overview | (R.Coleman) | 8444 |
10:00 | Coffee Break |    |    |
10:30 | HRS Schedule | (S. Werkema) | 8449 |
11:00 | Heat & Radiation Shield Design | (L. Bartoszek) | 8442 |
11:45 | Lunch |    |    |
13:00 | More Heat & Radiation Shield Design | (L. Bartoszek) | 8442 |
13:45 | Coffee Break |    |    |
14:10 | Heat & Radiation Shield Installation | (L. Bartoszek) | 8442 |
15:40 | Executive Session |    |    |
17:00 | Adjourn |    |    |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:30 | Response to Reviewers Questions |    |    |
11:30 | Closeout |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HRS Requirements | 1092 | HRS Drawings | 3926 |
Adv. Aquisition plan/Bid Evaluation Criteria | 7457 | HRS QC Plan/Assembly Doc | 7095 |
Production Solenoid Reference Design | 3647 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HRS CRR1 Closeout Report | 8571 | Responses to Recommendations from the HRS CRR1 | 9489 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Collimation System Construction Readiness Review Charge (CRR1) | 8854 | Extinction Collimation System CRR1 Membership | Here |
Indico Extinction Collimation System CRR1 Website | Website |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:20 | Extinction System Collimators Overview/Response to Recommendations | (E. Prebys) | 8726 |
9:40 | Design/Procurement Plan | (V. Sidirov) | 8725 |
10:20 | Coffee Break |    |    |
10:35 | Executive Session (Closed) | ||
12:00 | Closeout |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Collimation System Fabrication Specifications | 8723 | Extinction Collimation System Procurement Specifications | 8723 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Collimation System Closeout Report | 9357 | Responses to Recommendations from the Extinction Collimation System CRR | 9534 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Magnets Construction Readiness Review Charge (CRR-II) | 8839 | Res Extraction System Magnets CRR-II Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
13:00 | Executive Session (Closed) |    |    |
13:30 | Resonant Extraction Overview | (V. Nagaslaev) | 8956 |
14:00 | Coffee Break |    |    |
14:30 | Resonant Extraction System Magnets | (V. Nagaslaev) | 8956 |
15:30 | Executive Session (Closed) | ||
15:30 | Closeout |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Design Review Report | 7073 | Resonant Extraction System Magnet Specs | 8125 |
Resonant Extraction Specifications | 7025 | Sextupole Magnets BOE | 3515 |
Resonant Extraction System Magnet QA Plan | 8125 | Resonant Extraction System Magnet Procurement Plan | 8125 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Closeout Report | 9291 | Responses to Recommendations from the Resonant Extraction System CRR | 11126 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Monitor System Construction Readiness Review Charge (CRR2) | 10068 | Extinction Monitor System CRR2 Membership | Here |
Indico Extinction Monitor System CRR1 Website | Website |
Time | Title | Speaker | Mu2e-doc-# |
8:30 | Executive Session (Closed) |    |    |
9:00 | Extinction Monitor Overview | (P. Kasper) | 10215 |
9:30 | Mechanical Design and Installation | (L. Bartoszek) | 10218 |
10:15 | Discussion |    |    |
10:30 | Coffee | ||
10:45 | Pixel Assembly and Commissioning | (A.Gaponenko) | 10227 |
11:15 | Discussion |    |    |
11:30 | Electronics and DAQ | (M. Jones) | 10224 |
12:00 | Discussion |    |    |
12:30 | Working Lunch |    |    |
14:00 | Questions & Answers |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Monitor Documentation | 10068 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Monitor System Closeout Report | 11102 | Responses to Recommendations from the Extinction Monitor System CRR | 11105 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Protection Collimator Construction Readiness Review Charge | 13218 | Protection Collimator CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
8:30 | Executive Session (Closed) |    |    |
9:00 | Protection Collimator Requirements | (V. Nagaslaev) | 12539 |
9:30 | Protection Collimator Design | (D. Mitchell) | 12539 |
10:30 | Coffee | ||
10:50 | Protection Collimator Procurement Plan | (D. Pushka) | 12539 |
11:30 | Discussion |    |    |
12:00 | Working Lunch |    |    |
13:00 | Questions & Answers | ||
14:00 | Executive Session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Protection Collimator Requirements | 2897 | Protection Collimator Eng Req & Specs | 2902 |
Accelerator Interfaces | 1529 | Protection Collimator Interfaces | 13022 |
Protection Collimator Procurement Specifications | 13148 | Responses from Previous Review Recommendations | 6597 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Protection Collimator Closeout Report | 14715 | Responses to Recommendations from the Protection Collimator CRR | 14718 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Ext Beam, Rad Safety and Instr & Controls CRR Charge | 13317 | Ext Beam, Rad Safety and Instr & Controls CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
8:30 | Executive Session (Closed) |    |    |
9:00 | External Beamlines | (D. Still) | 12749 |
10:00 | Coffee | ||
10:15 | Radiation Safety | (T. Kroc) | 13526 |
11:15 | Instrumentation & Controls | (B. Drendel) | 8134 |
12:15 | Working Lunch |    |    |
13:15 | Questions & Answers | ||
14:15 | Executive Session |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Accelerator Requirements | 1374 | Accelerator Interfaces | 1529 |
Instrumentation & Controls Specs & Interfaces | 7124 | QA/QC Instrumentation & Controls | 11948 |
Radiation Safety Specifications & Interfaces | 7072 | Ext Beam line Trim PS Specifications | 12266 |
M4 Vacuum Design Component List (Redesign after flood) | 12844 | M4 Power Supply Support Document | 3590 |
External Beamlines- Magnet Power Supply Requirements | 3612 | M4 Beamline Magnet Names, Operating Currents and Lattice | 3375 |
M4 External BeamLine Vacuum System Requirements | 3596 | External Beamline Construction Readiness Review | 8004 |
Radiation Safety Technical Design Review | Link | Ext Beam and Instrumentation & Controls Technical Design Review | Link |
Standards for the Mu2e Construction Readiness Reviews | 7790 | Responses from Previous Review Recommendations | 6258 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Ext Beamline, Rad Safety and Instrumentation & Controls CRR Closeout Report | 14418 | Responses to Recommendations from the Ext Beamline, Rad Safety and Instrumentation & Controls CRR CRR | 20586 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HRS CRR2 Charge | 13529 | HRS CRR2 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
8:30 | Executive Session (Closed) |    |    |
9:00 | Intro - HRS Requirements | (S. Werkema) | 13314 |
9:30 | HRS Installation | (L. Bartoszek) | 13314 |
10:30 | Coffee | ||
10:50 | Procurement Plan, QA Specs and Bid Eval Plan | (D. Pushka) | 13314 |
11:10 | Responses to Previous Recommendations | (D. Pushka) | 13314 |
11:30 | Integration Model | (D. Pushka) | 13314 |
11:40 | Installation Machine Calculations | (L. Bartoszek) | 13314 |
12:00 | Lunch |    |    |
13:00 | HRS Shipping Frame/Lifting Fixture | (I. Fang) | 13314 |
13:20 | HRS Pressure Vessel - Changes since CRR1 | (D. Pushka) | 13314 |
13:50 | Questions & Answers | ||
14:30 | Executive Session |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:30 | Response to Reviewers Questions |    |    |
11:30 | Discussion with Proponents |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HRS Requirements | 1092 | HRS Drawings | 3926 |
HRS Shipping Frame Connection Forces | 13118 | HRS Pressure Vessel Calculations | 10164 |
Prelim Results from HRS Shipping Frame FEA | 12722 | HRS Under Differential Pressure | 12197 |
HRS Installation Machine Drawings | 12710 | HRS Shipping Frame Drawings | 10377 |
Manufacturing Drawings for HRS-D | 3926 | Hand Calculations for HRS Transp & Install Fixtures | 13010 |
Adv. Procurement plan for the HRS | 8561 | HRS Pressure Vessel & Assembly QC Spec | 12659 |
Production Solenoid Reference Design | 3647 | HRS CRR1 Closeout Report | 8571 |
Accelerator Requirements | 1374 | Accelerator Interfaces | 1529 |
Standards for the Mu2e Construction Readiness Reviews | 7790 | Responses from Previous Review Recommendations | 6258 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
HRS Lifting Fixture Closeout Report | 14178 | Response to Recommendations from the HRS Lifting FixtureCRR2 | 20589 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Delivery Ring LLRF Charge | 14163 | Delivery Ring LLRF CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
13:00 | Delivery Ring Low Level RF | (J. Dey) | 14187 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Standards for the Mu2e Construction Readiness Reviews | 7790 | Responses from Previous Review Recommendations | Here |
Beam Studies for Delivery Ring | 7582 | Delivery Ring LLRF System | 7176 |
Delivery Ring LLRF System Specifications | 7295 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Delivery Ring LLRF Closeout Report | 14754 | Response to Recommendations from the Delivery Ring CRR LLRF | 20580 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Monitor Filter Construction Readiness Review Charge (CRR3) | 19486 | Extinction Monitor Filter CRR3 Membership | Here |
Indico Extinction System CRR3 Website | Website |
Time | Title | Speaker | Mu2e-doc-# |
13:00 | Executive Session (Closed) |    |    |
13:15 | Extinction Monitor System Filter Overview | (P. Kasper) | 19576 |
13:45 | Extinction Monitor Filter Design | (L. Bartoszek) | 19570 |
15:15 | Coffee Break |    |    |
15:35 | Q&A | ||
16:00 | Executive Session (closed) | ||
17:00 | Adjourn |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Monitor Filter Drawings | 18945 | Mu2e Extinction Monitor Requirements | 894 |
Mu2e QA Plan | 677 | Mu2e QA Subsystem Planning Document | 6005 |
Mu2e Extinction Monitor Interfaces | 1529 | Mu2e Conventional Construction Interfaces | 1537 |
Mu2e Procurement Plan | 2350 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Collimation System Closeout Report - CRR1 | 9357 | Extinction Collimation System Closeout Report - CRR2 | 11102 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction Montitor Filter Closeout Report - CRR3 | 21324 | Responses to Recommendations from the Extinction Monitor Filter CRR3 | 22079 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Electronics Construction Readiness Review Charge (CRR-III) | 21051 | Res Extraction System Electronics CRR-III Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
10:00 | Executive Session (Closed) |    |    |
10:15 | Introduction to Resonant Extraction & Spill Regulation | (V. Nagaslaev) | 21183 |
10:55 | Coffee Break |    |    |
11:15 | Spill Regulation System | (P. Prieto) | 21183 |
11:55 | Executive Session (Closed) | ||
12:30 | Closeout |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Design Review Report | 7073 | Resonant Extraction Specifications | 7025 |
Spill Regulation System Specifications | 20871 | Spill Regulation System Architecture | 20871 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Closeout Report | 24196 | Response to Recommendations from the Resonant Extraction System CRR | 41100 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
External Beamline Construction Readiness Review Charge (CRR3) | 24202 | External Beamline CRR3 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
13:00 | Executive Session (Closed) |    |    |
13:15 | Ext Beamline Final Focus Scope (Magnets, Vacuum System & Installation) | (D. Still) | 21030 |
14:30 | Coffee Break |    |    |
14:45 | Q&A Session |    |    |
15:00 | Executive Session (Closed) |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
External Beamline Documentation for CRR3 | 21030 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
External Beamline CRR3 Closeout Report | 30179 | Response to Recommendations from the External Beamline CRR3 CRR | 30502 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Power Supplies Construction Readiness Review Charge (CRR-4) | 26316 | Res Extraction System Electronics CRR-4 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
08:00 | Executive Session (Closed) |    |    |
8:15 | Overview of the Resonant Extraction System & Power Supplies | (V. Nagaslaev) | 26337 |
8:45 | Power Supplies for the Resonant Extraction Magnets | (D. Barak) | 26340 |
9:45 | Coffee Break |    |    |
10:00 | Executive Session (Closed) |    |    |
11:00 | Adjourn |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Design Review Report | 7073 | Resonant Extraction Specifications | 7025 |
Resonant Extraction Power Supply Documentation | 25947 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System PS Closeout Report | 26721 | Response to Recommendations frmo the Resonant Extraction System PS CRR | 41100 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction System AC Dipoles Construction Readiness Review Charge (CRR4) | 26385 | Extinction System AC Dipoles CRR4 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:30 | AC Dipole CRR - Overview, Scope & Requirements | (D. Still) | 26427 |
9:50 | Extinction Overview | (S. Werkema) | 26436 |
10:10 | AC Dipole Magnet - 0.5m Prototype Measurements | (L. Elementi) | 26445 |
10:25 | AC Dipole Magnet - 1m Prototype Measurements | (H. Pfeffer) | 26433 |
10:45 | Coffee Break |    |    |
11:00 | Ferrite Measurements | (L. Elementi) | 26448 |
11:20 | Ferrite Modeling | (Iouri Terechkine) | 26439 |
11:50 | AC Dipole Vacuum Testing | (Mayling Wong-Squires) | 25335 |
12:15 | Lunch | ||
13:15 | AC Dipole Magnet Design | (A. Makarov) | 21039 |
13:45 | Procurement Plan | (D. Harding) | 26424 |
14:05 | Answers to Charge Questions | (D. Still) | 26430 |
14:25 | Q&A Session | ||
14:55 | Executive Session (Closed) |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction System AC Dipole Documentation | 25548 |     |     |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction System AC Dipole Closeout Report | 26860 | Response from the Extinction System AC Dipole CRR | 30511 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Radiation Safety Construction Readiness Review Charge (CRR3) | 27804 | Radiation Safety CRR3 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
10:00 | Executive Session (Closed) |    |    |
10:05 | CRR3a for Radiation Safety Improvements | (T. Kroc) | 26553 |
10:15 | Summary of Previous Shielding Analysis of AP30 Region | (T. Kroc) | 26553 |
10:30 | CRR3a - Design Overview, Procurement & Installation Plan | (C. Crowley) | 26553 |
11:00 | Q&A |    |    |
11:15 | Executive Session | Committee |   |
12:00 | Adjourn |   |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Radiation Safety Documentation for CRR3 | 26553 |    |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Radiation Safety & Shielding CRR3 Closeout Report | 28188 | Response to Recommendations from the Radiation Safety & Shielding CRR3 | XXXX |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Production Target Construction Readiness Review Charge | 30808 | Production Target CRR Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
08:00 | Executive Session (Closed) |    |    |
08:30 | Production Target (Hayman 2)-Requirements & Design | (D. Pushka) | 30814 |
09:30 | Target FEA | (I. Fang) | 30817 |
10:30 | Coffee/Q&A |    |    |
11:00 | Executive Session/Writing | Committee |   |
12:00 | Adjourn |   |    |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Electrostatic Septum Construction Readiness Review Charge | 36605 | Electrostatic Septum Membership | Here |
Time | Title | Speaker | Mu2e-doc-# | |
9:00 | Executive Session (Closed) | (R. Rucinski) | 36980 |    |
9:30 | Introduction to Resonant Extraction System and the ESS Specifications | (V. Nagaslaev) | 36288 | |
10:00 | ESS Prototype Design & Performance | (V. Nagaslaev) | 36288 | |
10:30 | Coffee Break |    |    | |
10:45 | Production ESS Design | (M. Alvarez) | 36288 | |
11:30 | ESS Fabrication | (M. Alvarez) | 36288 | |
12:00 | Q&A | |||
12:15 | Lunch | |||
13:00 | ESS Installation | (N. Curfman) | 36288 | |
13:20 | Infrastructure and Management | (V. Nagaslaev) | 36288 | |
14:05 | Q&A | |||
14:20 | Executive Session (Closed) | |||
16:00 | Closeout | |||
16:30 | Adjourn |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction System Design Review Report | 7073 | Resonant Extraction Specifications | 7025 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Resonant Extraction ESS CRR Closeout Report | 41097 | Response to Recommendations from the Resonant Extraction ESS CRR | 41100 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Standards for the Mu2e Construction Readiness Reviews | 7790 | Mu2e Risk Register | 4320 |
Accelerator Interface Control Document | 1529 | Accelerator Interface Sign-Offs | sign-offs |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
RH Cart & RHR Shield Door Construction Readiness Review Charge | 37860 | RH Cart & RHR Shield Door Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
9:00 | Executive Session (Closed) |    |    |
9:15 | RHR Shield Door & Air Seal & RH Transfer Cart: Design, Risk Mitigation & Fabrication Plans | (D. Pushka) | 37782 |
10:45 | Coffee Break |    |    |
11:00 | Q&A |    |    |
11:45 | Lunch | ||
12:30 | Executive Session (Closed) | ||
13:30 | Closeout | ||
14:00 | Adjourn |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
FMEA for Shield Door, Air Seal & Transfer Cart | 37782 | Shield Door & Air Seal Procurement Plan | 37782 |
Shield Door & Air Seal Reactions & Nodal Forces | 14412 | RH Shield Door Fabrication Drawings | 8068 |
RH Transfer Cart Procurement Plan | 37782 | Transfer Cart Stress & Displacement Analysis | 14232 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
RH Cart & RHR Shield Door CRR Closeout Report CRR Closeout Report | 38777 | Response to Recommendations from the RH Cart & Shield Door CRR | XXXX |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Standards for the Mu2e Construction Readiness Reviews | 7790 | Mu2e Risk Register | 4320 |
Accelerator Interface Control Document | 1529 | Accelerator Interface Sign-Offs | sign-offs |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction System AC Dipole Power Supplies Construction Readiness Review Charge (CRR5) | 47056 | Extinction System AC Dipole Power Supplies CRR5 Membership | Here |
Time | Title | Speaker | Mu2e-doc-# |
8:30 | Executive Session (Closed) |    |    |
9:00 | Overview of Extinction AC Dipole System | (D. Still & S. Werkema) | 43117 |
9:20 | AC Dipole Power Supplies (Low Freq (300kHz) and High feq (4.4Mhz)) - Overview, Scope & Requirements | (D. Barak) | 43117 |
10:30 | Coffee Break |    |    |
10:45 | Quality and Procurement Plan | (D. Barak) | 43117 |
11:15 | Answers to Charge Questions | (D. Still and D. Barak) | 43117 |
11:30 | Questions and Answers Session | ||
11:45 | Executive Session (Closed) |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction System AC Dipole Documentation | 25548 | Extinction System AC Dipole Power Supply Documentation | 43117 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Extinction System AC Dipole Closeout Report | 47242 | Response from the Extinction System AC Dipole CRR | XXXX |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
  Accelerator Design and Requirements |
  |   |   |
Mu2e Technical Design Report [Accelerator (Ch. 4)] | 4299 | Science Driven Requirements | 4381 |
Proton Beam Absorber Requirements | 948 | Beam Extinction Requirements | 1175 |
Production Solenoid Heat and Radiation Shield Requirements | 1092 | Production Target Requirements | 887 |
Proton Beam Requirements | 1105 | Extinction Monitor Requirements | 894 |
Protection Collimator Requirements | 2897 | Accelerator Interface Control Document | 1529 |
Title | Mu2e-doc-# | Title | Mu2e-doc-# |
Final report from DOE CD-3c Review (July 14-16, 2016) | 7967 | Responses to recommendations from DOE CD-3c Review (July 14-16 2016) | 7728 |
Director's pre-CD-2/3b Review Closeout Report - 22 July, 2014 | 4404 | Replies to Recommendations from Director's pre-CD-2/3b Review - 22 July, 2014 | 4405 |
DOE CD-2/3b Review Closeout Report - 21-24 October, 2014 | 5035 | Replies to Recommendations from DOE CD-2/3b Review - 21-24 October, 2014 | 5040 |
Director's pre-CD-3c Review Closeout Report - 19-21 April, 2016 | 7315 | Replies to Recommendations from Director's pre-CD-3c Review - 19-21 April, 2016 | 7330 |
DOE CD-3c Review Closeout Report - 14-17 June, 2016 | 7651 | Replies to Recommendations from DOE CD-3c Review - 14-17 June, 2016 | 7728 |
Resonant Extraction Review (Aug 25-27, 2015) | Here | Final Report from 27-Aug-2015 Replies |
7073 |
Beamline, Controls & Instrumentation Review (Oct 6-7, 2015) | Here | Final Report from 7-Oct-2015 Replies |
6239 |
Accelerator Radiation and Safety Improvements Review (Oct 20, 2015) | Here | Final Report from 20-Oct-2015 Replies |
6438 |
Extinction and Extinction Monitoring Review (Nov 2-3, 2015) | Here | Final Report from 3-Nov-2015 Replies |
6356 |
Target, Target Handling, and HRS Review (Nov 16-18, 2015) | Here | Final Report from 18-Nov-2015 Replies |
6853 |
Delivery Ring RF Review (Nov 23, 2015) | Here | Final Report from 23-Nov-2015 Replies |
6861 |
Protection Collimator Review (Jan 19, 2016) | Here | Final Report from 19-Jan-2016 Replies |
6597 |
Standards for Mu2e Construction Readiness Reviews: Mu2e-doc-7790
Mu2e Construction Readiness Reviews - Recommendations Tracking Table: Mu2e-doc-11663
Mu2e Design Reviews - Recommendations Tracking Table: Mu2e-doc-6258
Review materials can be found here: Mu2e Review Indico Sites