CD-1 Review of Mu2e
June 5-7, 2012

List of Documents by Mu2e Document Number

On this page, the Mu2e CD-1 design, schedule, planning and other non-BOE documents are listed in order by Mu2e document number.

BOE documents are not included on this page; they are listed in WBS order on each L2 page, and in several cases this order coincides with Mu2e document number order.

Additional documents posted during the CD-1 review may be missing from this list; check Documents Posted During Review.

For assistance in obtaining any documentation, references, etc., please contact . For document content questions, please contact the appropriate L2 manager (see Project Contact List).

Mu2e Design, Schedule and Planning Documents

Title Mu2e-doc-#
Mu2e FNAL Organization chart PDF file
Mu2e Project/Collaboration Org Chart PDF file
Closeout report from CD-0 review 382
Contingency Rules 459
Risk Management Plan 461
Project Management Plan 508
Configuration Management and Change Control 509
Life Cycle Costs 524
Preliminary Hazard Analysis Document 675
Security Vulnerability Assessment 676
Quality Management Plan 677
CD-0 Mission Need Statement 720
Tracker Requirements 732
Labor Charging Practices for Projects 763
Integrated Safety Management Plan 785
Key Assumptions 836
Cosmic Ray Veto Parameters 862
Calorimeter Requirements Document 864
Production Target Requirements 887
Extinction Monitor Requirements 894
Cosmic Ray Veto Requirements 944
Production Solenoid Requirements 945
Detector Solenoid Requirements 946
Transport Solenoid Requirements 947
Proton Beam Absorber Requirements 948
Muon Beamline WBS Dictionary (DOC) 991
WBS 05.03 – Collimators 1044
Space Offset Waiver 1051
Acquisition Strategy 1074
Conventional Facilities Requirements 1088
Production Solenoid Heat and Radiation Shield Requirements 1092
Proton Beam Requirements 1105
Transport Solenoid Collimators Requirements 1129
Trigger and DAQ Requirements 1150
WBS 05.11 – Muon Beamline System Integration, Tests and Analysis 1168
Conceptual Design Report 1169
P5 Report 2008 1171
Preliminary Project Execution Plan 1172
Beam Extinction Requirements 1175
Power Supply System Requirements 1237
Quench Protection System Requirements 1238
Cryogenic Distribution Requirements 1244
Magnetic Field Measurement Requirements 1275
Wetlands Report 1286
FNAL Standard Resource List 1305
Life Safety Report 1314
Conventional Construction Milestone Dictionary 1315
Conventional Construction WBS Dictionary 1316
WBS 05.08 – Muon Beam Stop 1351
WBS 05.09 – Neutron Absorbers 1371
WBS 05.10 – Detector Support and Installation System 1383
WBS 05.05 – Muon Stopping Target 1437
WBS 05.06 – Muon Stopping Target Monitor 1438
WBS 05.07 – Proton Absorber 1439
Risk Register 1463
Mu2e Solenoid Interface Specification 1470
Quality Assurance Plan for the Muon Beamline 1471
WBS 05.02 – Beamline Vacuum System 1481
WBS 05.04 – Muon Beamline Shielding 1506
Trigger and DAQ Interfaces 1520
Mu2e Accelerator Systems Interface Document 1529
Conventional Construction Interface Document 1537
Cosmic Ray Veto Interface Specifications 1551
Tracker Interfaces 1562
Final report from Independent Design Review (May 2011) 1563
Cosmic Ray Veto WBS 1580
Findings and Recommendations of the Mu2e Task Force -- a VE exercise 1911
Engineering Risk Assessment, Mu2e-wide 1980
LEED Analysis 2005
Accelerator Engineering Risk Assessment 2046
Muon Beamline Engineering Risk Assessment 2057
Responses to recommendations from 2011 Independent Design Review 2067
Trigger and DAQ WBS Dictionary 2087
Trigger and DAQ Milestone Dictionary 2116
Value Engineering for CD-1 2118
Mu2e Muon Beamline Milestone Dictionary (XLS) 2119
Cosmic Ray Veto WBS Dictionary 2135
Engineering Risk Assessment for the Cosmic Ray Veto 2137
Engineering Risk Assessment - Trigger and DAQ 2138
Solenoid WBS Dictionary 2146
Solenoid Milestone Dictionary 2147
Cost Range 2151
WBS Dictionary for Tracker 2157
Milestone Dictionary for Tracker 2158
Accelerator WBS Dictionary 2185
Cosmic Ray Veto Milestone Dictionary 2187
Calorimeter WBS Dictionary 2188
Calorimeter Milestone Dictionary 2189
Calorimeter Interface Specifications 2195
Milestone Dictionary 2196
Resource and Gantt Chart 2205
Critical Path 2205
Final report from CD-1 Director's Review (April 2012) 2209
Cost Book 2211
Engineering Risk Assessment for the Tracker 2223
Engineering Risk Assessment for the Solenoids 2224
Conventional Construction Engineering Risk Assessment 2225
Engineering Risk Assessment for Calorimeter 2239
Responses to recommendations from CD-1 Director's Review 2240
Milestones 2254
Muon Campus Program Plan 2255